sort by date sort by cost
Total 4 entries found , Cost: 42.5 million FCFA
Aug 10, 2020 C_EDEA_II SIGNE 8.5 million FCFA 008/LC/CAEDII/SG/2020
Construction d`un Forage à Malimba Urbain(Colline de la Joie) LOT 2
Prestataire: AUTHENTIC NATIONAL COOPERATION MULTIPLE
Aug 10, 2020 C_EDEA_II SIGNE 8.5 million FCFA 009/LC/CAEDII/SG/SM/2020
Construction d`un Forage à EKITE 1 (Village MELONE) LOT 1
Prestataire: AUTHENTIC NATIONAL COOPERATION MULTIPLE
Jul 22, 2020 PREF_SANAGA_MARITIME SIGNE 9.0 million FCFA 008/LC/C.18/SP/2020
Réhabilitation du bloc administratif de la PNPE (Travaux de carrelage et aménagement des blocs latrines)
Prestataire: AUTHENTIC NATIONAL COOPERATION MULTIPLE
Apr 22, 2020 C_POUMA SIGNE 16.5 million FCFA 003/LC/CP/SG/SM/2020
EP de SOKELLE1 : Construction d’un bloc de deux salles de classe
Prestataire: AUTHENTIC NATIONAL COOPERATION MULTIPLE

Top Dates