sort by date sort by cost
Total 17 entries found , Cost: 1.3 billion FCFA
2018 UNIV_BUEA ATTRIBUE
construction of administrative and pedagogic block in httc kumba
2018 UNIV_BUEA ATTRIBUE
provision of catering services to the student of ub
Prestataire: DIVINE GRACE CATERING SARL MULTIPLE
2018 UNIV_BUEA INFRUCTUEUX
Provision of catering service to the students of UB
Prestataire: MISSING
2018 UNIV_BUEA INFRUCTUEUX
Supply and installation of generators at the HTTTC Kumba
Prestataire: MISSING
2018 UNIV_BUEA INFRUCTUEUX
SUPPLY OF SERVICE VEHICLE TO HTTTC
Prestataire: MISSING
Aug 23, 2018 UNIV_BUEA SIGNE 50.0 million FCFA 2018/0019/UB/DPPI
COMPLETION OF CONSTRUCTION OF POULTRY UNITS FOR FAVM
Prestataire: KINGSMARC CONSULT
Aug 08, 2018 UNIV_BUEA SIGNE 48.5 million FCFA 2018/009/UB/DPPI
For the rehabilitation of the halls at UB
Prestataire: TECHCAM COMPANY LTD MULTIPLE
Jul 12, 2018 UNIV_BUEA SIGNE 464.4 million FCFA 003/ub/dppi
CONSTRUCTION OF AN ADMINISTRATIVE AND PEDAGOGIC BLOCK OF THE HIGHER TECHNICAL TEACHERS TRAINING COLLEGE,KUMBA
Jul 12, 2018 UNIV_BUEA SIGNE 39.1 million FCFA 1630/ub/dppi
OVERSEING OF CONSTRUCTION OF THE TECHNOLOGY BLOCK FOR THE FACULTY OF ENGINEERING AND TECHNOLOGY AND THE
Prestataire: VICKTO TEKNIKS MISSING
Jul 12, 2018 UNIV_BUEA SIGNE 40.0 million FCFA 2018/0006/UB/DPPI
PROVISION OF PERMANENT ELECTRICITY TO THE TECHNOLOGY PARK
Jul 12, 2018 UNIV_BUEA SIGNE 10.0 million FCFA 2018/631/ub/dppi
Provision of insurance service for 600 students of the UB
Prestataire: ZENITH MULTIPLE
Jul 12, 2018 UNIV_BUEA SIGNE 439.6 million FCFA 2018/0004/ub/dppi
CONSTRUCTION OF THE TECHNOLOGY BLOCK FOR THE FACULTY OF ENGINEERING AND TECHNOLOGY AND THE COLLEGE OF TECHNOLOGY (PHASE II)
Jul 12, 2018 UNIV_BUEA SIGNE 14.9 million FCFA 2018/0005/ub/dppi
SUPPLY AND INSTALLATION OF FURNITURE AT CLASSROOM BLOCK III
Jul 05, 2018 UNIV_BUEA SIGNE 90.0 million FCFA 2018/004/ub/dppi
Suply installation of kitchen equiment at UB students restaurant
Jun 07, 2018 UNIV_BUEA SIGNE 44.0 million FCFA 0002/ub/dppi
OVERSEING OF THE CONSTRUCTION OF THE ADMINISTRATIVE AND PEDAGOGIC BLOCK OF THE HIGHER TECHNICAL TEACHERS TRAINING
Prestataire: MAAK DESIGN GOUP MISSING
May 16, 2018 UNIV_BUEA SIGNE 45.0 million FCFA 2018/1302/ub/dppi
For the construction of a water drainage System along University corridor
Prestataire: MAAK DESIGN GOUP MISSING
Sep 21, 2017 UNIV_BUEA RECEPTIONNE 38.6 million FCFA 2017/0027/UB/DPPI
SUPPLY AND INSTALLATION OF EQUIPMENT TO THE ELECTRICAL TECHNOLOGY OUTDOOR LABORATORY AT THE UNIVERSITY OF BUEA PHASE II
Prestataire: ETS BITAMA MULTIPLE

Top Authorities
Top Dates