Total 2 entries found , Cost: 1.6 billion FCFA
Aug 14, 2020 SODECOTON SIGNE 813.7 million FCFA 068/19/M/SDCC/CIPM
Construction des hangars de stockage à l’égrenage de GUIDER
Prestataire: ETS AWAH MULTIPLE
Aug 14, 2020 SODECOTON ATTRIBUE 813.7 million FCFA 068/19/M/SDCC/CIPM
Construction des hangars de stockage à l’égrenage de GUIDER
Prestataire: ETS AWAH MULTIPLE