sort by date sort by cost
Total 2 entries found , Cost: 1.3 billion FCFA
Dec 14, 2021 SODECOTON SIGNE 824.3 million FCFA 089B/21/M/SDCC/CIPM
TRAVAUX DE CONSTRUCTION DE DEUX (2) MAGASINS DESTOCKAGE DE 4800M2 CHACUN, EN DEUX (02) LOTS DISTINCTS, A L`USINED`EGRENAGE DU COTON DE GOUNA
Prestataire: COPRES SARL MULTIPLE
Dec 14, 2021 SODECOTON SIGNE 482.8 million FCFA 090/21/M/SDCC/CIPM
TRAVAUX DE CONSTRUCTION DU BÂTIMENT PRINCIPAL DE L`USINE ÉGRENAGE DU COTON DE GOUNA
Prestataire: COPRES SARL MULTIPLE

Top Authorities
Top Prestataires
Top Dates