sort by date sort by cost
Total 9 entries found , Cost: 164.5 million FCFA
2023 PREF_WOURI ATTRIBUE
Construction l`Inspection d`Arrondissement de l`Education de Base SDIBE DOUALA 6
2023 PREF_WOURI ATTRIBUE
Réhabilitation de la préfecture du Wouri
Prestataire: GENERAL COMMERCIAL COMPAGNY LTD MULTIPLE
2023 PREF_WOURI ATTRIBUE
TRAVAUX DE RÉHABILITATION DU CENTRE SOCIAL DE NKOLOLOUN
Prestataire: ETS FOSSI PROSPER MULTIPLE
2023 PREF_WOURI ATTRIBUE
Réhabilitation de la perception de LOGBABA
Prestataire: GENERAL COMMERCIAL COMPAGNY LTD MULTIPLE
Aug 20, 2023 PREF_WOURI SIGNE 30.0 million FCFA 05/D/PREFECTURE/W/2023
Construction l`Inspection d`Arrondissement de l`Education de Base SDIBE DOUALA 6
Jun 10, 2023 PREF_WOURI SIGNE 35.0 million FCFA 004/LC/PREFET-W/CIPM/2023
Construction du Bâtiment à usage de bureau à JAPOMA (Douala III)
Prestataire: ETS D.S.J
Jun 05, 2023 PREF_WOURI SIGNE 14.9 million FCFA 03/LC/CAD2/CIPM/ST/2023
Finalisation des travaux de construction de la Délégation d`Arrondissement de l`Elevage, des Peches et desIndustries Animales de Douala IV
Prestataire: ETS GROUPE EMERGENCE MULTIPLE
May 09, 2023 PREF_WOURI SIGNE 64.6 million FCFA 001/M/CDPM-W/C19/PERCEPTION-DOUALA3/2023
Réhabilitation de la perception de LOGBABA
Prestataire: GENERAL COMMERCIAL COMPAGNY LTD MULTIPLE
May 09, 2023 PREF_WOURI SIGNE 20.0 million FCFA 001/LC/CDPM-W/C19/PREF-W/2023
Réhabilitation de la préfecture du Wouri
Prestataire: GENERAL COMMERCIAL COMPAGNY LTD MULTIPLE

Top Authorities
Top Dates