sort by date sort by cost
Total 7 entries found , Cost: 96.1 million FCFA
Jul 29, 2019 PREF_MOUNGO RECEPTIONNE 8.5 million FCFA 05/LC/C.16/SP/19
Bomono Ba Mbengue : Forage Équipe
Prestataire: SCR ENGINEERING MULTIPLE
Jul 25, 2019 PREF_MOUNGO RECEPTIONNE 16.9 million FCFA 07/LC/C.16/SP/2019
Forage équipé à: Grand souza et Mangaba
Prestataire: SCR ENGINEERING MULTIPLE
Jul 29, 2019 PREF_MOUNGO RECEPTIONNE 16.9 million FCFA 06/LC/C.16/SP/2019
BONA BWENG et BOSSEDI 2 : Construction de deux forages équipés
Prestataire: SCR ENGINEERING MULTIPLE
Jul 29, 2019 PREF_MOUNGO SIGNE 8.5 million FCFA 05/LC/C.16/SP/19
Bomono Ba Mbengue : Forage Équipe
Prestataire: SCR ENGINEERING MULTIPLE
Jul 25, 2019 PREF_MOUNGO RECEPTIONNE 8.5 million FCFA 04/LC/C.16/SP/19
Ecole publique de NDOKOU : Forage Équipe
Prestataire: SCR ENGINEERING MULTIPLE
Jul 25, 2019 PREF_MOUNGO SIGNE 16.9 million FCFA 07/LC/C.16/SP/2019
Forage équipé à: Grand souza et Mangaba
Prestataire: SCR ENGINEERING MULTIPLE
Jul 25, 2019 PREF_MOUNGO SIGNE 19.9 million FCFA 08/LC/C.16/SP/19
Prison principale de Mbanga: Construction d`un château d`eau et d`un forage
Prestataire: SCR ENGINEERING MULTIPLE

Top Authorities
Top Prestataires
Top Dates