sort by date sort by cost
Total 4 entries found , Cost: 34.2 million FCFA
Sep 23, 2019 PREF_BUI RECEPTIONNE 6.0 million FCFA 07/JO/MINAT/E26/2019
Equipment of the Bui(kumbo) Divisional Delegation of MINDEVEL
Prestataire: ETS M&N ENGENEERING MULTIPLE
Sep 23, 2019 PREF_BUI RECEPTIONNE 6.0 million FCFA 08/JO/MINDDEVEL/E26/2019
EQUIPMENT OF THE DO RESIDENCE
Prestataire: ETS M&N ENGENEERING MULTIPLE
Sep 23, 2019 PREF_BUI SIGNE 11.0 million FCFA 06/JO/MINESEC/E26/2019
GBHS KIMBO-KUMBO- RECONSTRUCTION OF TWO CLASSROOMS(LOT2)
Prestataire: ETS M&N ENGENEERING MULTIPLE
Sep 23, 2019 PREF_BUI SIGNE 11.2 million FCFA 05/JO/MINESEC/E26/2019
RECONSTRUCTION OF CLASSROOM IN GBHS IN JAKIRI(LOT1)
Prestataire: ETS M&N ENGENEERING MULTIPLE

Top Authorities
Top Prestataires
Top Dates