sort by date sort by cost
Total 10 entries found , Cost: 145.2 million FCFA
2019 PREF_BUI INFRUCTUEUX
EQUIPMENT OF THE DO RESIDENCE
Prestataire: MISSING
Sep 26, 2019 PREF_BUI SIGNE 17.0 million FCFA 09/JO/MINEPAT/E26/2019
DD BUI; CONSTRUCTION OF BOREHOLE CONNECTED TO A WATER TANK SYSTEM USING SOLAR PANEL FOR ENERGY
Prestataire: ETS MARITANTS
Sep 23, 2019 PREF_BUI RECEPTIONNE 6.0 million FCFA 08/JO/MINDDEVEL/E26/2019
EQUIPMENT OF THE DO RESIDENCE
Prestataire: ETS M&N ENGENEERING MULTIPLE
Sep 23, 2019 PREF_BUI RECEPTIONNE 6.0 million FCFA 07/JO/MINAT/E26/2019
Equipment of the Bui(kumbo) Divisional Delegation of MINDEVEL
Prestataire: ETS M&N ENGENEERING MULTIPLE
Sep 23, 2019 PREF_BUI SIGNE 11.2 million FCFA 05/JO/MINESEC/E26/2019
RECONSTRUCTION OF CLASSROOM IN GBHS IN JAKIRI(LOT1)
Prestataire: ETS M&N ENGENEERING MULTIPLE
Sep 23, 2019 PREF_BUI SIGNE 11.0 million FCFA 06/JO/MINESEC/E26/2019
GBHS KIMBO-KUMBO- RECONSTRUCTION OF TWO CLASSROOMS(LOT2)
Prestataire: ETS M&N ENGENEERING MULTIPLE
Jun 10, 2019 PREF_BUI RECEPTIONNE 20.0 million FCFA 04/JO/MINNESEC/E26/2019
GTHS KUMBO; EQUIPMENT OF THE COMPUTER LABORATORY-N-COMPUTING TECHNOLOGY AND FURNITURE AT GTHS KUMBO
Prestataire: ETS M&N ENGINEERING MULTIPLE
Jun 10, 2019 PREF_BUI SIGNE 22.0 million FCFA 02/JO/MINESEC/BUI/2019
CONSTRUCTION OF A BLOCK OF TWO CLASSROOMS AT GBHS KIMBO-BUI(LOT2)
Prestataire: ETS M&N MISSING
Jun 10, 2019 PREF_BUI SIGNE 22.0 million FCFA 01/JO/MINESEC/E26/2019
CONSTRUCTION OF A BLOCK OF TWO CLASSROOMS AT GTC KINSEJAM(LOT1)
Prestataire: ETS M&N ENGINEERING MULTIPLE
Jun 10, 2019 PREF_BUI SIGNE 30.0 million FCFA 03/JO/MINESEC/E26/2019
CONSTRUCTION OF BIOMEDICAL MAINTENANCE WORKSHOPIN GTHS KUMBO
Prestataire: FEATURE PLANNER ENTERPRISE INACTIF

Top Authorities
Top Dates