sort by date sort by cost
Total 3 entries found , Cost: 163.3 million FCFA
Apr 22, 2024 PREFET_LOGONE_CHARI SIGNE 49.8 million FCFA 003/LC/K23/2024
TRAVAUX D`AMENAGEMENT DES VOIRIES ET RESEAUX DIVERS A L`INTERIEUR DE LA RESIDENCE DU PREFET DU LOGONE ET CHARI (KOUSSERI).
Prestataire: ETS AL AZIZ MULTIPLE
Mar 11, 2024 PREFET_LOGONE_CHARI SIGNE 73.5 million FCFA 001/M/K23/2024
Travaux de Réalisation de Trois (03) Mini Adduction d`Eau Potables dans certaines Localités de HILE ALIFA.
Prestataire: ETS ADJIT ALHADJI MULTIPLE
Mar 09, 2024 PREFET_LOGONE_CHARI SIGNE 40.0 million FCFA 001/LC/K23/2024
TRAVAUX DE CONSTRUCTION ET EQUIPEMENT D`UN BLOC MATERNEL A L`ECOLE MATERNELLE D`ARDEBE ARRONDISSEMENT DE KOUSSERI