Aug 26, 2021
PAD
SIGNE
145.2 million
FCFA
333/M/CIPM-AS/PAD/2021
FOURNITURE, L’INSTALLATION ET LA MISE EN SERVICE DE TROIS GROUPES ÉLECTROGENES DE 165KVA AU PORT AUTONOME DE DOUALA.
Aug 26, 2021
PAD
SIGNE
48.9 million
FCFA
334/LC/CIPM-AS/PAD/2021
FOURNITURE, L’INSTALLATION ET LA MISE EN SERVICE D’UN GROUPE ÉLECTROGÈNE DE 165 KVA POUR L’IMMEUBLE SIÈGE DE LA SUBDIVISION PORTUAIRE DE LIMBÉ.