FOURNITURE ET LA MISE EN SERVICE D’UN (01) GROUPE ÉLECTROGENE DE 165 KVA POUR LA PROTECTION DE L’INFRASTRUCTURE INFORMATIQUE À L’IMMEUBLE SIÈGE DU PORT AUTONOME DE DOUALA.
Aug 26, 2021
PAD
RECEPTIONNE
48.9 million
FCFA
334/LC/CIPM-AS/PAD/2021
FOURNITURE, L’INSTALLATION ET LA MISE EN SERVICE D’UN GROUPE ÉLECTROGÈNE DE 165 KVA POUR L’IMMEUBLE SIÈGE DE LA SUBDIVISION PORTUAIRE DE LIMBÉ.
Aug 26, 2021
PAD
RECEPTIONNE
145.2 million
FCFA
333/M/CIPM-AS/PAD/2021
FOURNITURE, L’INSTALLATION ET LA MISE EN SERVICE DE TROIS GROUPES ÉLECTROGENES DE 165KVA AU PORT AUTONOME DE DOUALA.
Aug 26, 2021
PAD
SIGNE
145.2 million
FCFA
333/M/CIPM-AS/PAD/2021
FOURNITURE, L’INSTALLATION ET LA MISE EN SERVICE DE TROIS GROUPES ÉLECTROGENES DE 165KVA AU PORT AUTONOME DE DOUALA.
Aug 26, 2021
PAD
SIGNE
48.9 million
FCFA
334/LC/CIPM-AS/PAD/2021
FOURNITURE, L’INSTALLATION ET LA MISE EN SERVICE D’UN GROUPE ÉLECTROGÈNE DE 165 KVA POUR L’IMMEUBLE SIÈGE DE LA SUBDIVISION PORTUAIRE DE LIMBÉ.
Jul 08, 2019
PAD
SIGNE
142.9 million
FCFA
177/M/CIPM-ICAE/PAD/2019
Fourniture installation et mise en service des surpresseurs eau froide et de la tuyauterie pour les immeubles R+7 et R+15 du PAD
Aug 06, 2018
PAD
SIGNE
193.1 million
FCFA
072/M/PAD/CIPM-AS/2018
Fourniture,Installation et la mise en service d`un onduleur triphasée et tropicalisée de 80KVA et des services informatiques et matériels du PAD
Jul 27, 2018
PAD
SIGNE
137.4 million
FCFA
068/M/PAD/CIPM-AS/2018
Fourniture,Installation et mise en service de deu groupes électrogène de 500KVA pour l`immeuble siège et IGH du PAD