sort by date sort by cost
Total 3 entries found , Cost: 16.5 million FCFA
2015 MINESEC ANNULE
Construction du lycée technique de Maroua (lot1) et du CETIC de NSAM (lot2) EN 02 LOTS LOT 1
Prestataire: ANNULE MISSING
2015 MINESEC ANNULE
Construction du lycée technique de Maroua (lot1) et du CETIC de NSAM (lot2) EN 02 LOTS LOT 2
Prestataire: ANNULE MISSING
Mar 26, 2015 MINESEC ANNULE 16.5 million FCFA 02/LC/PR/MINMAP/DR-OU/DDMIFI/CDPM/2015
Lycée de BAPI: Construction de bloc de deux salles de classe LOT 2

Top Authorities
Top Dates