sort by date sort by cost
Total 4 entries found , Cost: 73.2 million FCFA
Nov 03, 2017 MINESEC SIGNE 9.5 million FCFA 40/17/LC/AONR/MINESEC/DRFM
EXECUTION DES TRAVAUX DE CONSTRUCTION DES INFRASTRUCTURES SCOLAIRES DANS CERTAINES LOCALITES DU TERRITOIRE NATIONAL
Nov 03, 2017 MINESEC SIGNE 40.0 million FCFA 39/17/LC/AONR/MINESEC/DRFM/CMPM
Maîtrise d`oeuvre pour la construction de l`ENIEG d`EDEA clé en main
Nov 03, 2017 MINESEC SIGNE 14.2 million FCFA 42/17/LC/AONR/MINESEC/DRFM/CMPM/2017
TRAVAUX DE CONSTRUCTION DE CERTAINS INFRASTRUCTURES SCOLAIRES AU MINESEC LOT3
Nov 03, 2017 MINESEC SIGNE 9.5 million FCFA 41/17/LC/AONR/MINESEC/DRFM/CMPM
TRAVAUX DE CONSTRUCTION DES INFRASTRUCTURES SCOLAIRES DANS CERTAINES LOCALITES

Top Authorities
Top Dates