sort by date sort by cost
Total 19 entries found , Cost: 583.9 million FCFA
2023 MINAC ATTRIBUE
Construction de la maison de la culture de Nanga-Eboko (Phase 3)
2023 MINAC ATTRIBUE
acquisition d`un véhicule de type berline. Lot 03
2023 MINAC ATTRIBUE
acquisition du matériel roulant au musée national
Prestataire: SFT LE GRAND
2023 MINAC ATTRIBUE
Acquisition du matériel roulant
2023 MINAC ATTRIBUE
acquisition d`un véhicule de type station wagon lot2
2023 MINAC ATTRIBUE
Construction de la Délégation Régionale du Nord-Ouest
Prestataire: ETS TABANG MULTIPLE
2023 MINAC ATTRIBUE
Réfection des boiseries du Musée National
Prestataire: GROUPE JEG SARL
May 22, 2023 MINAC SIGNE 71.8 million FCFA 10/M/MINAC/SG/DAG/SDBMM/SMAR/2023
Construction de la maison de la culture de Nanga-Eboko (Phase 3)
May 22, 2023 MINAC SIGNE 53.8 million FCFA 09/M/MINAC/SG/DAG/SDBMM/SM/2023 LOT 02
acquisition d`un véhicule de type station wagon lot2
Prestataire: AFROMNI MOTOR SARL 12months
May 22, 2023 MINAC SIGNE 56.0 million FCFA 07/M/MINAC/SG/DAG/SDBMM/SM/23
Construction de la Délégation Régionale du Nord-Ouest
Prestataire: ETS TABANG MULTIPLE
May 22, 2023 MINAC SIGNE 55.0 million FCFA 08/M/MINAC/SG/DAG/SDBMM/SMP/23
Construction de la maison de la Culture de Yabassi (Phase 3)
May 22, 2023 MINAC SIGNE 33.8 million FCFA 09/M/MINAC/SG/DAG/SDBMM/SM/2023 LOT 03
acquisition d`un véhicule de type berline. Lot 03
Prestataire: AFROMNI MOTOR SARL 12months
May 22, 2023 MINAC SIGNE 34.9 million FCFA 09/M/MINAC/SG/DAG/SDBMM/SM/2023 LOT 01
Acquisition du matériel roulant
Prestataire: AFROMNI MOTOR SARL 12months
May 04, 2023 MINAC SIGNE 58.0 million FCFA 05/M/MINAC/SG/DAG/SDBMM/SMAR/2023
Construction de la Maison de la Culture de Ntui (Phase 4)
May 04, 2023 MINAC SIGNE 50.8 million FCFA 06/M/MINAC/SG/DAG/SDBMM/SMAR/23
Construction du foyer culturel de la Haute Sanaga (Phase 3)
Prestataire: MAXIMUM SARL MULTIPLE
May 04, 2023 MINAC SIGNE 5.0 million FCFA 04/MINAC/SG//DAG/SDBMM/SMAR/2023
Construction de la Maison de la Culture de BAHAM (Phase 3)
Prestataire: ETS LA REBIADA
Apr 24, 2023 MINAC SIGNE 45.0 million FCFA 02/LC/MINAC/SG/DAG/SDBMM/SM/2023
Construction de la Maison de la Culture de Mora (Phase 3)
Prestataire: ETS MAHAMA ABBA MULTIPLE
Apr 24, 2023 MINAC SIGNE 69.5 million FCFA 03/M/MINAC/SG/DAG/SDBMM/SM/23
Construction de la Délégation Régionale du Sud-Ouest (Phase 5)
Mar 01, 2023 MINAC RECEPTIONNE 50.5 million FCFA 01/LC/MINAC/SG/DAG/SDBMM/SM/2022
Réfection de l`étancheité du Musée National
Prestataire: AZIZ ET FILS SARL MULTIPLE

Top Authorities
Top Dates