sort by date sort by cost
Total 3 entries found , Cost: 159.6 million FCFA
Sep 06, 2022 MINAC RECEPTIONNE 14.6 million FCFA 07/LC/MINAC/SG/DAG/SDBMM/SM/2022
Electrification des réserves du Musée National
Prestataire: ETS EXPRESS MULTIPLE
Jun 24, 2022 MINAC SIGNE 70.0 million FCFA 05/M/MINAC/SG/DAG/SDBMM/SM/2022
Poursuite des travaux de construction du Foyer Culturel de la Haute Sanaga (Phase 2)
Prestataire: ETS EXPRESS MULTIPLE
Apr 25, 2022 MINAC RECEPTIONNE 75.0 million FCFA 02/M/MINAC/SG/DAG/SDBMM/SM/2022
Poursuite des travaux de construction de la Maison de la Culture de Ntui (Phase 3)
Prestataire: ETS EXPRESS MULTIPLE

Top Authorities
Top Prestataires
Top Dates