Total
43
entries found
, Cost: 5.3 billion FCFA
Jul 25, 2023
MIDIMA
SIGNE
9.1 million
FCFA
056/MIDIMA/MO/CIPM/2023
FOURNITURE DES MATÉRIELS INFORMATIQUES A LA MISSION DE DÉVELOPPEMENT INTÉGRÉ DES MONTS MANDARA (MIDIMA) A MAROUA,DÉPARTEMENT DU DIAMARE,RÉGION DE L`EXTREME- NORD
Jun 12, 2023
MIDIMA
SIGNE
18.4 million
FCFA
002/LC/MIDIMA/CIPM/2023
TRAVAUX DE CONSTRUCTION D`UN FORAGE PASTORAL A ÉNERGIE SOLAIRE (LOT1) DANS LA LOCALITÉ DE KAHEO,COMMUNE DE DARGALA,DÉPARTEMENT DU DIAMARE ET DE DEUX (02) FORAGES PRODUCTIFS ÉQUIPES DE POMPE A MOTRICITÉ HUMAINE (LOT2) RESPECTIVEMENT DANS LES LOCALITÉS DE TCBAHOL-GUIZIGA,COMMUNE DE MERI,DÉPARTEMENT DU DIAMARE ET MEME,COMMUNE DE MORA,DÉPARTEMENT DU MAYO SAVA,REGION DE L`EXTREME-NOR
Jun 12, 2023
MIDIMA
SIGNE
29.0 million
FCFA
001/LC/MIDIMA/CIPM/2023
TRAVAUX DE CONSTRUCTION D`UN FORAGE PASTORAL A ÉNERGIE SOLAIRE (LOT1) DANS LA LOCALITÉ DE KAHEO,COMMUNE DE DARGALA,DÉPARTEMENT DU DIAMARE ET DE DEUX (02) FORAGES PRODUCTIFS ÉQUIPES DE POMPE A MOTRICITÉ HUMAINE (LOT2) RESPECTIVEMENT DANS LES LOCALITÉS DE TCBAHOL-GUIZIGA,COMMUNE DE MERI,DÉPARTEMENT DU DIAMARE ET MEME,COMMUNE DE MORA,DÉPARTEMENT DU MAYO SAVA,REGION DE L`EXTREME-NORD
May 16, 2022
MIDIMA
SIGNE
11.0 million
FCFA
02/LC/MIDIMA/CIPM/2022
Equipement des services de la MIDIMA en matériel informatique
May 16, 2022
MIDIMA
SIGNE
32.0 million
FCFA
03/LC/MIDIMA/CIPM-AI/2022
Construction d`un forage pastoral à énergie solaire à KAHEO dans la Commune de Dargala
May 16, 2022
MIDIMA
SIGNE
8.4 million
FCFA
01/LCMIDIMA/CIPM-AG/2022
Equipement des services de la MIDIMA en mobilier de bureau
May 16, 2022
MIDIMA
SIGNE
24.0 million
FCFA
LC04/LC/MIDIMA/CIPM-AI/2022
Construction de deux (02) forages productifs équipés de Pompe à Motrice Humaine (PMH) dans les localités de TCHABAWOL Guiziga, Commune de Méri et MEME, Commune de Mora
May 16, 2022
MIDIMA
SIGNE
20.0 million
FCFA
05/LC/MIDIMA/CIPM/2022
Réalisation d`une étude diagnostique sur la vulnérabilité des populations aux risques d`inondations dans la Région de l`Extrême-Nord
Jan 10, 2022
MIDIMA
SIGNE
404.2 million
FCFA
006/M/MIDIMA/CIPM-AI/2021
Travaux de Réhabilitation de la Retenue d`Eau de OUMBEDA et ses OUVRAGES CONNEXES.
Jan 10, 2022
MIDIMA
SIGNE
757.3 million
FCFA
005/M/MIDIMA/CIPM-AI/2021
Travaux de Réhabilitation de la Retenue d`Eau de RHUMSIKI à MOGODE.
Jan 10, 2022
MIDIMA
SIGNE
215.0 million
FCFA
004/M/MIDIMA/CIPM-AI/2021
Travaux de Construction d`un Systeme d`Alimentation en Eau Potable à ZIDIM - MBIDA.
Jan 10, 2022
MIDIMA
SIGNE
127.2 million
FCFA
003/M/MIDIMA/CIPM-AI/2021
Travaux de Construction d`un Systeme d`Alimentation en Eau Potable à MAOUDINE (MINDIF).
Travaux de Construction de Forage Productif Equipé de PMH à Makalingai Hamidou Malloum (lot 3)
Travaux de Construction de Forage Productif Equipé de PMH à Barza Centre, canton mokong. (lot 2)
TRAVAUX DE CONSTRUCTION DE CINQ (05) forages PMH DANS CERTAINES LOCALITES DES ARRONDISSEMENTS DE LA REGION DE L`EXTREME NORD (AGAIDA DJAORO OUMAROU)
Jan 10, 2022
MIDIMA
ATTRIBUE
757.3 million
FCFA
005/M/MIDIMA/CIPM-AI/2021
Travaux de Réhabilitation de la Retenue d`Eau de RHUMSIKI à MOGODE.
Jan 10, 2022
MIDIMA
ATTRIBUE
127.2 million
FCFA
003/M/MIDIMA/CIPM-AI/2021
Travaux de Construction d`un Systeme d`Alimentation en Eau Potable à MAOUDINE (MINDIF).
Jan 10, 2022
MIDIMA
ATTRIBUE
215.0 million
FCFA
004/M/MIDIMA/CIPM-AI/2021
Travaux de Construction d`un Systeme d`Alimentation en Eau Potable à ZIDIM - MBIDA.
Jan 10, 2022
MIDIMA
ATTRIBUE
404.2 million
FCFA
006/M/MIDIMA/CIPM-AI/2021
Travaux de Réhabilitation de la Retenue d`Eau de OUMBEDA et ses OUVRAGES CONNEXES.
Jul 01, 2019
MIDIMA
SIGNE
72.5 million
FCFA
01/M/MIDIMA/CIPM-AI/2019
TRAVAUX DE CONSTRUCTION D`UN SYSTÈME D`ALIMENTATION EN EAU POTABLE SIMPLIFIÉ (AEPS) DANS LA LOCALITÉ DE FADARE, COMMUNE DE PETTE, DÉPARTEMENT DU DIAMARÉ, RÉGION DE L`EXTRÊME-NORD
Construction d’un (01) forage productif équipé de Pompe à Motricité Humaine (PMH), à Kosséhone, Commune de Mokolo
Construction d`un Bief à OURO BAMARE
Apr 27, 2018
MIDIMA
RECEPTIONNE
10.0 million
FCFA
10/LC/MIDIMA/CIPM-TAI/2018
Construction d’un (01) forage productif équipé de Pompe à Motricité Humaine (PMH), à Kosséhone, Commune de Mokolo
Apr 27, 2018
MIDIMA
RECEPTIONNE
6.2 million
FCFA
09/LC/MIDIMA/CIPM-TAI/2018
Construction d`un Bief à OURO BAMARE
Apr 18, 2018
MIDIMA
RECEPTIONNE
46.5 million
FCFA
07/M/MIDIMA/PERPREN/CIPM-TAI/2018
Construction réseaux MT/BT 10 villages Lot 6
Apr 18, 2018
MIDIMA
RECEPTIONNE
53.1 million
FCFA
06/M/MIDIMA/PERPREN/CIPM-TAI/2018
Construction réseaux MT/BT 10 villages Lot 3
Apr 18, 2018
MIDIMA
SIGNE
52.9 million
FCFA
08/M/MIDIMA/PERPREN/CIPM-TAI/2018
Construction réseaux MT/BT 10 villages Lot 8
Apr 17, 2018
MIDIMA
SIGNE
43.9 million
FCFA
01/M/MIDIMA/PERPREN/CIPM-TAI/2018
Construction réseaux MT/BT 10 villages Lot 2
Apr 17, 2018
MIDIMA
SIGNE
59.4 million
FCFA
02/M/MIDIMA/PERPREN/CIPM-TAI/2018
Construction réseaux MT/BT 10 villages Lot 7
Apr 17, 2018
MIDIMA
SIGNE
85.0 million
FCFA
03/M/MIDIMA/PERPREN/CIPM-TAI/2018
Construction réseaux MT/BT 10 villages Lot1
Apr 16, 2018
MIDIMA
SIGNE
45.7 million
FCFA
05/M/MIDIMA/PERPREN/CIPM-TAI/2018
Construction réseaux MT/BT 10 villages Lot 5
Apr 09, 2018
MIDIMA
SIGNE
56.9 million
FCFA
04/M/MIDIMA/PERPREN/CIPM-TAI/2018
Construction réseaux MT/BT 10 villages Lot 4
Oct 25, 2017
MIDIMA
SIGNE
105.7 million
FCFA
0028/M/MIDIMA/PERPREN/CIPM-AG/2017
MARCHE DE FOURNITURE DE CERTAINS MATÉRIELS ET APPAREILLAGES RELATIFS AUX TRAVAUX DE CONSTRUCTION DES LIGNES ÉLECTRIQUES MT/BT, DE DIX VILLAGES LOT 3
Oct 25, 2017
MIDIMA
SIGNE
190.6 million
FCFA
28/M/MIDIMA/PERPREN/CIPM-AG/2017
MARCHE DE FOURNITURE DE CERTAINS MATÉRIELS ET APPAREILLAGES RELATIFS AUX TRAVAUX DE CONSTRUCTION DES LIGNES ÉLECTRIQUES MT/BT, DE DIX VILLAGES LOT 4
Oct 25, 2017
MIDIMA
SIGNE
565.0 million
FCFA
027/M/MIDIMA/PERPREN/CIPM-AG/2017
MARCHE DE FOURNITURE DE CERTAINS MATÉRIELS ET APPAREILLAGES RELATIFS AUX TRAVAUX DE CONSTRUCTION DES LIGNES ÉLECTRIQUES MT/BT, DE DIX VILLAGES LOT 1
Oct 25, 2017
MIDIMA
SIGNE
423.0 million
FCFA
028/M/MIDIMA/PERPREN/CIPM-AG/2017
MARCHE DE FOURNITURE DE CERTAINS MATÉRIELS ET APPAREILLAGES RELATIFS AUX TRAVAUX DE CONSTRUCTION DES LIGNES ÉLECTRIQUES MT/BT, DE DIX VILLAGES LOT 2
Aug 30, 2017
MIDIMA
RECEPTIONNE
13.4 million
FCFA
26/LC/MIDIMA/CIPM-AG/2017
FOURNITURE D`UN (01) APPAREIL TOPOGRAPHIQUE
COMPLET (STATION TOTAL) À LA MISSION DE DÉVELOPPEMENT INTÉGRÉ DES MONTS MANDARA (MIDIMA), DEPARTEMENT DU MAYO-TSANAGA, REGION DE L`EXTRÊME-NORD
Aug 11, 2017
MIDIMA
RECEPTIONNE
106.0 million
FCFA
25/M/MIDIMA/CIPM/2017
FOURNITURE, DE MISE EN SERVICE ET DE SERVICE APRÈS-VENTE DE QUATRE VÉHICULES PICK-UP DOUBLE CABINE CLIMATISÉ, DIRECTION ASSISTÉE, 04 PORTIÈRES, 06 PLACES, 4X4 DIESEL 3.0 L, À LA MISSION DE DÉVELOPPEMENT INTÉGRÉ DES MONTS MANDARA (MIDIMA).
Prestataire:
CAMI
MULTIPLE
Jun 09, 2017
MIDIMA
RECEPTIONNE
75.7 million
FCFA
18/M/MIDIMA/PERPREN/CIPM-TAI/2017
CONSTRUCTION DES RÉSEAUX MT/BT ET BRANCHEMENTS DANS DEUX VILLAGES (Keftah dans la Commune Koza, et Mogodé dans la Commune de Mogodé) POUR LE COMPTE DU PROJET D*ÉLECTRIFICATION DE 16 VILLAGES EN ZONE RURALE ET PÉRIURBAINE LOT4
Jun 09, 2017
MIDIMA
RECEPTIONNE
62.7 million
FCFA
20/M/MIDIMA/PERPREN/CIPM-TAI/2017
CONSTRUCTION DES RÉSEAUX MT/BT ET BRANCHEMENTS DANS DEUX VILLAGES (Keftah dans la Commune Koza, et Mogodé dans la Commune de Mogodé) POUR LE COMPTE DU PROJET D*ÉLECTRIFICATION DE 16 VILLAGES EN ZONE RURALE ET PÉRIURBAINE LOT12
Jun 09, 2017
MIDIMA
RECEPTIONNE
53.6 million
FCFA
19/M/MIDIMA/PERPREN/CIPM-TAI/2017
CONSTRUCTION DES RÉSEAUX MT/BT ET BRANCHEMENTS DANS DEUX VILLAGES (Keftah dans la Commune Koza, et Mogodé dans la Commune de Mogodé) POUR LE COMPTE DU PROJET D*ÉLECTRIFICATION DE 16 VILLAGES EN ZONE RURALE ET PÉRIURBAINE LOT10
Pour le recrutementd'un bureau d'études techniques (BET) devant conduire les études de faisabilité des barages de Tchévi Lot 1
Pour le recrutementd'un bureau d'études techniques (BET) devant conduire les études de faisabilité des barages de Maboudji Lot 2