sort by date sort by cost
Total 10 entries found , Cost: 195.2 million FCFA
2023 MIDENO ATTRIBUE
For the supply of one Land Cruiser Prado.
Prestataire: ETS TIK CAM MISSING
2023 MIDENO ATTRIBUE
Acquisition of farm inputs for the production of quality planting materials on 225 ha for maize, 22.5 ha solanum potato seeds and the establishment of plantain seedlings farm on 7ha land in three (3) DIVISIONS in the NWR
Prestataire: EM CAMEROON
2023 MIDENO ATTRIBUE
Acquisition of farm inputs to support farmers in the NWR
Prestataire: EM CAMEROON
Oct 27, 2023 MIDENO SIGNE 46.9 million FCFA 006/MIDENO/B/MITB/13/84
Construction of an open hangar (sheds) for the management of heavy duty equipment pool at RDC Nkwen ,Bamenda
Oct 27, 2023 MIDENO SIGNE 20.0 million FCFA 008/MIDENO/MITB/13/04
reconstruction of a potato seed store and repair of roof of the adjacent warehouse at the TDC SANTA lot 3
Oct 27, 2023 MIDENO SIGNE 17.9 million FCFA 00/MIDENO/B/19/3
Renovation and refurbishment of MIDENO head office building Bamenda to improve on security, safety and inclusiveness
Prestataire: NEBCAM LIMITED
Jun 13, 2023 MIDENO RECEPTIONNE 44.9 million FCFA 05/MIDENO/B/MITB/13/84
Acquisition of farm inputs for the production of quality planting materials on 225 ha for maize, 22.5 ha solanum potato seeds and the establishment of plantain seedlings farm on 7ha land in three (3) DIVISIONS in the NWR
Prestataire: EM CAMEROON
Jun 13, 2023 MIDENO RECEPTIONNE 19.9 million FCFA 04/MIDENO/B/MITB/13/84
Acquisition of farm inputs to support farmers in the NWR
Prestataire: EM CAMEROON
Feb 15, 2023 MIDENO RECEPTIONNE 24.9 million FCFA 03/MIDENO/B/MITB/13/84
The socio - economic empowerment of Persons with disabilities in the North West Region.
Feb 15, 2023 MIDENO SIGNE 20.6 million FCFA 01/MIDENO/B/MITB/18/84
For the supply of office furniture
Prestataire: TIMM ENTERPRISE MULTIPLE

Top Authorities
Top Dates