Total
45
entries found
, Cost: 4.1 billion FCFA
TERRASSEMENT DU LOTISSEMENT DE BOTA A LIMBE
BORNAGE DES PARCELLES DANS LA ZONE DE RESTRUCTURATION DU LOTISSEMENT DE LOGBESSOU
TRAVAUX D`ALIMENTATION EN EAU POTABLE DU LOTISSEMENT DE NKOLNGUET OPERATION 192
PRODUCTION DES AGENDAS 2023 CONCEPTION ET IMPRESSION DES CALENDRIER AINSI QUE LES CARTES DE VOEUX 2023 A LA MAETUR
SOUSCRIPTION TRIENALE D`UNE POLICE D`ASSURANCE POUR LA BATTERIE D`ENGINS DE GENIE CIVIL ET DES CAMIONS DE LA MAETUR
FOURNITURE DU MATERIEL ROULANT NEUF
REALISATION DES TRAVAUX D`ALIMENTATION EN EAU POTABLE DU LOTISSEMENT DE NKONDOM I OPERATION 188
REALISATION DES TRAVAUX D`ALIMENTATION EN EAU POTABLE DU LOTISSEMENT DE NKONDOM II OPERATION 189
FOURNITURE ET INSTALLATION DE MATERIEL ET LOGICIEL INFORMATIQUE A LA MAETUR
TRAVAUX DE PEINTURE DE LA CLOTURE DE LA GUERITE ET DE L`IMMEUBLE SIEGE DE LA MAETUR
SOUSCRIPTION CRIENALE D`UNE POLICE D`ASSURANCE FLOTTE AUTOMOBILE POUR LA COUVERTURE DU PARC AUTONOME DE LA MAETUR
SOUSCRIPTION BIENNALE D`UNE POLICE D`ASSURANCE DÉCÈS POUR LE COMPTE DU PERSONNEL DE LA MAETUR
SELECTION D`UN COMMISSAIRE AUX COMPTES EN VUE DE LA VERIFICATION DES COMPTES ET DES ETATS FINANCIERS DE LA MAETUR
PRODUCTION DES AGENDAS 2022 LA CONCEPTION ET L`IMPRESSION DES CALENDRIERS AINSI QUE LES CARTES DE VOEUX 2022 A LA MAETUR
BORNAGE DES PARCELLES DU LOTISSEMENT DE NYLON ZONE CCC A DOUALA OPERATION 791
CONCEPTION ET IMPRESSION DES CALENDRIERS 2021 A LA MAETUR
OUVERTURE DES VOIES DANS LES LOTISSEMENTS DE SOBOUM 2
PRODUCTION DES AGENDAS 2021 A LA MAETUR
FOURNITURE MATERIEL ROULANT NEUF LOT 2 VEHICULE TOUT TERRAIN 4X4 PICK UP
Nov 26, 2020
MAETUR
SIGNE
300.6 million
FCFA
11/M/MAETUR/CIPM/21
TRAVAUX D`ALLIMENTATION EN EAU POTABLE DU LOTISSEMENT DE GBEGO A BERTOUA PHASE 1
Nov 26, 2020
MAETUR
SIGNE
51.9 million
FCFA
10/M/2020/MAETUR/CIPM/20
OUVERTURE DES VOIES DANS LES LOTISSEMENTS DE OYACK 2
Nov 06, 2020
MAETUR
SIGNE
240.5 million
FCFA
08/2020/MAETUR/CIPM
REALISATION DES MONUMENTS AU GIRATOIRE DE NSIMALEN SUR L`AUTOROUTE YAOUNDE NSIMALEN
Nov 06, 2020
MAETUR
SIGNE
310.6 million
FCFA
09/2020/MAETUR
FINALISATION ET INSTALLATION DE LA VIDEOSURVEILLANCE DANS LE CADRE DE LA SECURISATION DE L`AMENAGEMENT DES ABORDS URBANISABLES DE L`AUTOROUTE YAOUNDE NSIMALEN
Oct 02, 2020
MAETUR
SIGNE
27.0 million
FCFA
05/LC/MAETUR/CIPM/20
SOUSCRIPTION BIENALE D`UNE POLICE D`ASSURANCE MALADIE ASSISTANCE ET EVACUATION SANITAIRE POUR LE PERSONNEL DE LA MAETUR
Jul 29, 2020
MAETUR
SIGNE
53.9 million
FCFA
03/M/MAETUR/CIPM/20
GARDIENNAGE ET SECURISATION DES INSTALLATIONS DE LA MAETUR
Jul 29, 2020
MAETUR
SIGNE
75.3 million
FCFA
02/M/MAETUR/CIPM/20
GARDIENNAGE ET SECURISATION DES INSTALLATIONS DE LA MAETUR
Jul 14, 2020
MAETUR
SIGNE
11.7 million
FCFA
04/LC/MAETUR/CIPM/20
MISE EN PLACE D`UN NOUVEAU RESEAU INFORMATIQUE SECURISE A LA MAETUR
Jul 10, 2020
MAETUR
SIGNE
21.2 million
FCFA
02/LC/MAETUR/CIPM/20
MISE EN PLACE D`UN NOUVEAU RESEAU INFORMATIQUE SECURISE A LA MAETUR
Jul 10, 2020
MAETUR
SIGNE
23.0 million
FCFA
03/LC/MAETUR/CIPM/20
MISE EN PLACE D`UN NOUVEAU RESEAU INFORMATIQUE SECURISE A LA MAETUR
Apr 30, 2020
MAETUR
SIGNE
45.0 million
FCFA
01/LC/MAETUR/CIPM/19
FOURNITURE MATERIEL ROULANT NEUF LOT 4 VEHICULE TOUT TERRAIN 4X4 STATION WAGON
TRAVAUX D`ALIMENTATION EN ENERGIE ELECTRIQUE DU LOTISSEMENT NGOULMEKONG OPERATION 183
BORNAGE DES PARCELLES DU LOTISSEMENT DE NKONDOM 2
SOUSCRIPTION TRIENALE D`UNE POLICE D`ASSURANCE POUR LA BATTERIE D`ENGINS DE GENIE CIVIL ET DES CAMIONS DE LA MAETUR
Feb 21, 2019
MAETUR
SIGNE
1.6 billion
FCFA
03/2019/MAETUR
REALISATION DE LA CLOTURE DE SECURITE EN GRILLE MATALIQUE DANS LE CADRE DE L`AMENAGEMENT DES ABORDS URBANISABLE DE L`AUTOROUTE YAOUNDE NSIMALEN
FOURNITURE ET L`INSTALLATION DE LAMPADAIRES SOLAIRES AUTONOMES DANS LA ZONE D`HABITAT DE MBANGA BAKOKO A DOUALA: PHASE I (OPERATION 1022)
APPROVISIONNEMENT EN MATERIAUX POUR LES TRAVAUX DE DRAINAGE DES EAUX PLUVIALES ET LA CONSTRUCTION DE DEUX DALOTS SUR LES VOIES C ET D DU LOTISSEMENT DE NKONDOM II A MFOU (OPERATION 189)
FOURNITURE DE LAMPADAIRES SOLAIRES AUTONOMES DANS LA ZONE D`HABITAT D`OLEMBE A YAOUNDE: PHASE I (OPERATION 1021)
Oct 08, 2018
MAETUR
SIGNE
204.7 million
FCFA
08/1/2018/CIPM/MAETUR/18
REALISATION DES TRAVAUX DE BORNAGE DES PARCELLES ET BATIMENTS ET L ELABORATION DES ETATS DESCRIPTIFS DE DIVISION DES LOGEMENTS CONSTRUITS SURLE SITE D OLEMBE DANS LE CADRE DU PROGRAMME GOUVERNEMENTAL DE CONSTRUCTION DES LOGEMENTS SOCIAUX (OPERATION1021)
Oct 08, 2018
MAETUR
SIGNE
186.4 million
FCFA
08/1/2018/CIPM/MAETUR
REALISATIONDES TRAVAUX DE BORNAGE DES TRAVAUX DE BORNAGE DES PARCELLES ET L ELABORATION DES ETATS DESCRIPTIFS DE DIVISION DES LOGEMENTS CONSTRUITS SUR LE SITE D OLEMBE DANS LE CADRE DU PROGRAMME DE CONSTRUCTION DES LOGEMENTS SOCIAUX (OPERATION1021)
Apr 06, 2018
MAETUR
SIGNE
29.6 million
FCFA
002/L/2018/CIPM/MARTUR DU 06/04/2018
REALISATION DES TRAVAUX DE BORNAGE DES PARCELLES DU LOTISSEMENT OYACK NYLON (OPERATION 790)
Réalisation des travaux du quaternaire dans la zone d`habitat d`OLEMBE : Aménagement extérieur
Réalisation des Travaux du quaternaire dans la zone d`habitat de MBANG BAKOKO: Volet maçonnerie
Fourniture et installation de matériel informatique à la MAETUR
Réalisation en avant-projet sommaire (APS) des études architecturales en vue de l`extension de l`immeuble siège de la MAETUR
Jul 21, 2017
MAETUR
SIGNE
928.2 million
FCFA
005/1/2017/CIPM/MAETUR
Construction de 02 stations de traitement des eaux usées à OLEMBE- Yaoundé