sort by date sort by cost
Total 7 entries found
2018 GP_DERUDEP INFRUCTUEUX
CONSTRUCTION/REHABILITATION OF WATER SUPPLY SCHEMES IN 04 SELECTED PRODUCTION BASINS IN THE NW REGION (lekep,LIP,MBONSO AND MBORONG) MBAW/ MBONSO PRODUCTION BASIN
Prestataire: MISSING
2018 GP_DERUDEP INFRUCTUEUX
Supply of palm oil transformation equipments(SUPPLY OF PALM FRUITS OIL PROCESSING LINE AND PALM OIL MILL FOR WIDIKUM
Prestataire: MISSING
2018 GP_DERUDEP INFRUCTUEUX
CONSTRUCTION /REHABILITATION OF WATER SUPPLY SCHEMESS IN O4 SELECTED PRODUCTION BASINS IN THE NWR (AWI,DICHE,NGALLA-AMBONMBO-EKA AND MUNKEP ESU)
Prestataire: MISSING
2018 GP_DERUDEP INFRUCTUEUX
CONSTRUCTION OF RICE WARE HOUSES IN MBAW MBONSO AND GAYAMA PRODUCTION BASINS IN THE NORTH WEST REGION
Prestataire: MISSING
2018 GP_DERUDEP INFRUCTUEUX
CONSTRUCTION /REHABILITATION OF WATER SUPPLY SCHEMES IN FOUR SELECTED PRODUCTION BASINS IN THE KWINDEGLI,MBENDENG AWING,MTEME AND TIMISHWEI) SANTA/TUBAH PRODUCTION BASIN
Prestataire: MISSING
2018 GP_DERUDEP INFRUCTUEUX
Supply of cassava transformation equipments
Prestataire: MISSING
2017 GP_DERUDEP INFRUCTUEUX
REALISATION OF 34.7KM MEDIUM TENSION (MT) AND 14.8KM LOW TENSION ELECTRIC LINEIN MBAW MBONCO PRODUCTION BASIN
Prestataire: MISSING

Top Authorities
Top Prestataires
Top Dates