sort by date sort by cost
Total 9 entries found , Cost: 355.7 million FCFA
2024 DR_MINTOUL_SU ATTRIBUE
Achèvement des travaux de construction de l`Hôtel de Postes de Mboro
May 31, 2018 DR_MINTOUL_SU RECEPTIONNE 8.6 million FCFA 006/LC/PR/MINMAP/SG/DRMAP-SU/SMAS/CRPM/18
Equipement de la salle de conférences de la DRTOUL du Sud (lot 2)
Prestataire: ETS AS. MAGDALA MISSING
Apr 12, 2018 DR_MINTOUL_SU SIGNE 14.9 million FCFA 006/LC/PR/MINMAP/SG/DRMAP-SU/SMAS/CRPM/2018
MAITRISE D’ŒUVRE DES TRAVAUX DE RÉHABILITATION DE LA DIGUE DE PROTECTION DE L’HÔTEL DE L’OCÉAN
Prestataire: ENGINEERING PROVIDER MULTIPLE
Apr 12, 2018 DR_MINTOUL_SU SIGNE 149.9 million FCFA 006/M/PR/MINMAP/SG/DRMAP-SU/SMI/CRPM/2018
TRAVAUX DE RÉHABILITATION DE LA DIGUE DE PROTECTION DE L’HÔTEL DE L’OCÉAN A KRIBI
2017 DR_MINTOUL_SU ANNULE
Equipement de la DRTL du Sud en matériel informatique, lot 2
Prestataire: MISSING
Apr 12, 2018 DR_MINTOUL_SU ATTRIBUE 149.9 million FCFA 006/M/PR/MINMAP/SG/DRMAP-SU/SMI/CRPM/2018
TRAVAUX DE RÉHABILITATION DE LA DIGUE DE PROTECTION DE L’HÔTEL DE L’OCÉAN A KRIBI
Apr 12, 2018 DR_MINTOUL_SU ATTRIBUE 14.9 million FCFA 006/LC/PR/MINMAP/SG/DRMAP-SU/SMAS/CRPM/2018
MAITRISE D’ŒUVRE DES TRAVAUX DE RÉHABILITATION DE LA DIGUE DE PROTECTION DE L’HÔTEL DE L’OCÉAN
Prestataire: ENGINEERING PROVIDER MULTIPLE
Jul 06, 2017 DR_MINTOUL_SU RECEPTIONNE 5.7 million FCFA 027/LC/PR/MINMAP/SG/DRMAP-SU/SMAS/CRPM/17
Equipement en materiel informatique de la Délégation Régionale du DRTOUL - SUD
Prestataire: DAGO CONSULT SARL INACTIF
May 31, 2017 DR_MINTOUL_SU RECEPTIONNE 11.7 million FCFA 002/LC/PR/MINMAP/SG/DRMAP-SU/SMAS/CRPM/17
Equipement de la DRTL du Sud en mobilier et matériel de bureau
Prestataire: ETS GROUPE BRAYAN & NATHAN MISSING

Top Authorities