sort by date sort by cost
Total 2 entries found , Cost: 55.0 million FCFA
Apr 23, 2018 DR_MINHDU_AD RECEPTIONNE 25.0 million FCFA 009/LC/PR/MINMAP/SG/DRAD/SMAS/2018
Maitrise d`oeuvre des travaux de construction de la DR MINDHU de l`ADAMAOUA (phase 8)
Prestataire: ETS DJAMIRA MULTIPLE
May 04, 2017 DR_MINHDU_AD RECEPTIONNE 30.0 million FCFA N°022/LC/DRMINMAP/AD/CRPM/SMAS/2017
Maitrise d`oeuvre des Travaux de construction de la Délégation régionale de l`Adamoua
Prestataire: ETS DJAMIRA MULTIPLE

Top Authorities
Top Prestataires
Top Dates