sort by date sort by cost
Total 2 entries found , Cost: 275.0 million FCFA
May 08, 2018 DR_MINHDU_AD RECEPTIONNE 250.0 million FCFA 008/M/MINMAP/DR-AD/CRPM-TBEC/SMI/2018
Travaux de construction de la DR MINDHU de l`ADAMAOUA (phase 8)
Apr 23, 2018 DR_MINHDU_AD RECEPTIONNE 25.0 million FCFA 009/LC/PR/MINMAP/SG/DRAD/SMAS/2018
Maitrise d`oeuvre des travaux de construction de la DR MINDHU de l`ADAMAOUA (phase 8)
Prestataire: ETS DJAMIRA MULTIPLE

Top Authorities
Top Dates