sort by date sort by cost
Total 3 entries found , Cost: 35.0 million FCFA
2020 DR_MINEPAT_NW ATTRIBUE
construction of a borehole, 12M elevated plastic storage tank (5M3), equiped with an electrical pump at the DR
Prestataire: ETS FAIRCHILD
2019 DR_MINEPAT_NW ATTRIBUE
Construction of the staff quarters
Prestataire: ETS SAMOUA ROGER
May 23, 2018 DR_MINEPAT_NW SIGNE 35.0 million FCFA 28/JO/MINMAP/RDNW/NWRTB/2018
Construction of fence and tiling of the premises of the Regional Delegation of the RD MINEPAT
Prestataire: HOSEANA ENTERPRISE 5months

Top Authorities