construction of a borehole, 12M elevated plastic storage tank (5M3), equiped with an electrical pump at the DR
Construction of the staff quarters
May 23, 2018
DR_MINEPAT_NW
SIGNE
35.0 million
FCFA
28/JO/MINMAP/RDNW/NWRTB/2018
Construction of fence and tiling of the premises of the Regional Delegation of the RD MINEPAT