sort by date sort by cost
Total 2 entries found , Cost: 109.8 million FCFA
Apr 12, 2017 DR_MINEE_NW SIGNE 60.0 million FCFA 11/C/MINMAP/NWRTB/2017
Rural electrification of ACHAH Phase I, lot 2
Prestataire: CONCEPT ENGINEERING MULTIPLE
Mar 28, 2017 DR_MINEE_NW SIGNE 49.8 million FCFA 05/C/MINMAP/NWRTB/2017
Rural electrification of Bamessing Fondom Phase II, lot 1
Prestataire: ETS NGAICAM INACTIF

Top Authorities
Top Dates