sort by date sort by cost
Total 4 entries found , Cost: 108.6 million FCFA
2022 DD_MINFOF_OCEAN ATTRIBUE
Construction du poste de controle forestier et de chasse de Campo (Lot 2)
Prestataire: F2A ENGINEERING MISSING
Apr 25, 2022 DD_MINFOF_OCEAN SIGNE 38.0 million FCFA 004/LC/CDPM/CLO/2022
Construction du poste de controle forestier et de chasse de LOLODORF (Lot 3)
Prestataire: ALBARKA SARL MULTIPLE
Apr 25, 2022 DD_MINFOF_OCEAN SIGNE 32.8 million FCFA 004/LC/CIPM/CLO/2022
Construction d`un bloc de 03 salles de classe et deux bureaux au CES de MPALLA
Prestataire: ETS MAMBO MULTIPLE
Apr 25, 2022 DD_MINFOF_OCEAN SIGNE 37.8 million FCFA 007/LC/CDPM/PO/2022
Construction du poste de controle forestier et de chasse de Mvengue (Lot 1)

Top Authorities
Top Dates