sort by date sort by cost
Total 5 entries found
For the construction of a block of two (02) classrooms at GS BOMGOR ( relocated to GS MFE)
Prestataire: ETS FEGHANG SAMUEL NDIFON MULTIPLE
For the Construction of a Block of two (02) classrooms at GS FETOP (relocated to GS SHIE)
Prestataire: ETS FEGHANG SAMUEL NDIFON MULTIPLE
For the construction of a block of two (02) classrooms at GS Nwa
Prestataire: ETS FEGHANG SAMUEL NDIFON MULTIPLE
For the construction of a block of two (02) classrooms at GS TUM(relocated to GS JAH )Nwa
Prestataire: ETS FEGHANG SAMUEL NDIFON MULTIPLE
For the construction of an Administrative block in GNS SIH
Prestataire: ETS FEGHANG SAMUEL NDIFON MULTIPLE

Top Dates