sort by date sort by cost
Total 6 entries found , Cost: 29.5 million FCFA
For the construction of a block of two (02) classrooms at GS BOMGOR ( relocated to GS MFE)
Prestataire: ETS FEGHANG SAMUEL NDIFON MULTIPLE
For the Construction of a Block of two (02) classrooms at GS FETOP (relocated to GS SHIE)
Prestataire: ETS FEGHANG SAMUEL NDIFON MULTIPLE
For the construction of a block of two (02) classrooms at GS Nwa
Prestataire: ETS FEGHANG SAMUEL NDIFON MULTIPLE
For the construction of a block of two (02) classrooms at GS TUM(relocated to GS JAH )Nwa
Prestataire: ETS FEGHANG SAMUEL NDIFON MULTIPLE
For the construction of an Administrative block in GNS SIH
Prestataire: ETS FEGHANG SAMUEL NDIFON MULTIPLE
Apr 16, 2018 DD_MINEPAT_DONGA-MATUNG SIGNE 29.5 million FCFA 005/JO/MINMAP/RDNW/DDD-M/DTB/NKAMBE/2018
DD MINEFOP SAR/SM MISAJE: Construction of one blocks of 2 classrooms with the head master office of the SAR/SM
Prestataire: ETS FEGHANG SAMUEL NDIFON MULTIPLE

Top Dates