sort by date sort by cost
Total 8 entries found , Cost: 99.3 million FCFA
2018 DDM_MOMO INFRUCTUEUX
Construction of a block of two classrooms in gtc wumcheck Lot 2
Prestataire: MISSING
2018 DDM_MOMO INFRUCTUEUX
Equipment of a multimedia center sar/sm mbengwi
Prestataire: MISSING
Jul 04, 2018 DDM_MOMO RECEPTIONNE 14.9 million FCFA 23/JO/RQ/PR/MINMAP/DDMAP/2018
Equipment of a multimedia center sar/sm mbengwi
Jul 04, 2018 DDM_MOMO SIGNE 18.0 million FCFA /JO/MINMAP/RDNW/DDMOMO/DTB/2018
Rehabilitation of the d.o. office njikwa Lot 2
Prestataire: B&T SERVICES MULTIPLE
May 08, 2018 DDM_MOMO RECEPTIONNE 14.7 million FCFA 14/JO/RQ/PR/MINMAP/DDMAP/2018
Rehabilitation of the divisional delegation of women`s empowerment and the family
Prestataire: STE GOLDBETH SUARL INACTIF
May 08, 2018 DDM_MOMO SIGNE 19.9 million FCFA 15/JO/MINMAPRDNW/DDMOMO/DTB/2018
Construction of a block of two classrooms in gtc wumcheck Lot 2
Prestataire: ETS DIKAKA MULTIPLE
Apr 25, 2018 DDM_MOMO RECEPTIONNE 11.9 million FCFA 07/JO/RQ/PR/MINMAP/DDMAP/2018
Rehabilitation of the residence of the s.d.o Lot 1
Apr 23, 2018 DDM_MOMO SIGNE 20.0 million FCFA 004/JO/MINMAP/DRNO/DDMOMO/CPM/2018
Construction of a block of two classrooms in g.t.c tiben Lot 1
Prestataire: ALAHJI POLY CO LTD INACTIF -22months

Top Authorities
Top Dates