sort by date sort by cost
Total 2 entries found , Cost: 51.0 million FCFA
Aug 11, 2022 C_ZINA SIGNE 27.0 million FCFA 16/LC/C.ZINA/CIPM/2022
Réhabilitation de la route communale Mazéra- Mandjour (12 km)
Prestataire: BTPK-SARL 10months
Aug 11, 2022 C_ZINA SIGNE 24.0 million FCFA 005/LC/C.ZINA/CIPM/2022
Travaux de construction des infrastructures scolaires à l`EP de MAHE (LOT 4).
Prestataire: BTPK-SARL 10months

Top Authorities
Top Prestataires
Top Dates