sort by date sort by cost
Total 3 entries found , Cost: 43.9 million FCFA
2020 C_YAGOUA ATTRIBUE
Construction d`un bloc de deux salles de classe à L`EP DE DEHE
Apr 18, 2018 C_YAGOUA RECEPTIONNE 22.0 million FCFA 06/2018/LC/PR/MINMAP/SG/CIPM/YAG
Construction d`un bloc de 02 salles de classe l`EP de Yirdeng(FP) Lot 3
Apr 18, 2018 C_YAGOUA SIGNE 22.0 million FCFA 06/2018/LC/PR/MINMAP/SG/CIPM/YAG
Construction d`un bloc de 02 salles de classe l`EP de Yirdeng(FP) Lot 3

Top Authorities