sort by date sort by cost
Total 2 entries found , Cost: 5.0 million FCFA
2021 C_TOKOMBERE ATTRIBUE
Construction d’un bloc de deux salles de classe à l’EP MOLKO Lot 2
Prestataire: ETS LIMAN MULTIPLE
Apr 13, 2021 C_TOKOMBERE SIGNE 5.0 million FCFA 003/2021/C.TOK/CIPM-BEC/2021
Construction du centre integre (CSI) de MAMBEZA

Top Authorities
Top Dates