sort by date sort by cost
Total 13 entries found , Cost: 353.0 million FCFA
2023 C_TOKOMBERE ATTRIBUE
travaux d`entretien de la route: MADA-LADENE-GAHADA ZOUGOUDOU CARREFOUR (9.00KM)
Prestataire: ETS ABDOULAYE ALI MULTIPLE
Sep 07, 2023 C_TOKOMBERE SIGNE 170.0 million FCFA 03/M/C.TOK/CIPM-ROUTE/2023
travaux d`entretien de la route: MADA-LADENE-GAHADA ZOUGOUDOU CARREFOUR (9.00KM)
Prestataire: ETS ABDOULAYE ALI MULTIPLE
2020 C_TOKOMBERE ATTRIBUE
DOSSIER DE DEMANDE DE COTATION EN PROCEDURE D’URGENCE N°001/DDC/C.TOK/CIPM-AI/2020 DU 19/03/2020 POUR LA REALISATION DES FORAGES PASTORAUX EQUIPES DE POMPES A ENERGIE SOLAIRE, DE DEUX (02) ABREUVOIRS POUR LE GRAND BETAIL, D’UN (01) ABREUVOIR POUR LE PETIT BETAIL ET D’UNE (01) BORNE FONTAINE DANS CERTAINES AIRES DE PATURAGE DE LA COMMUNE DE TOKOMBERE: • LOT 3 : AIRE DE PATURAGE DE DOBIOKO
Prestataire: ETS ABDOULAYE ALI MULTIPLE
2020 C_TOKOMBERE ATTRIBUE
DOSSIER DE DEMANDE DE COTATION EN PROCEDURE D’URGENCE N°001/DDC/C.TOK/CIPM-AI/2020 DU 19/03/2020 POUR LA REALISATION DES FORAGES PASTORAUX EQUIPES DE POMPES A ENERGIE SOLAIRE, DE DEUX (02) ABREUVOIRS POUR LE GRAND BETAIL, D’UN (01) ABREUVOIR POUR LE PETIT BETAIL ET D’UNE (01) BORNE FONTAINE DANS CERTAINES AIRES DE PATURAGE DE LA COMMUNE DE TOKOMBERE: • LOT 1 : AIRES DE PATURAGE DE DALA-ZOULGO ET DE MOUNDOUVAYA
Prestataire: ETS ABDOULAYE ALI MULTIPLE
2020 C_TOKOMBERE ATTRIBUE
DOSSIER DE DEMANDE DE COTATION EN PROCEDURE D’URGENCE N°001/DDC/C.TOK/CIPM-AI/2020 DU 19/03/2020 POUR LA REALISATION DES FORAGES PASTORAUX EQUIPES DE POMPES A ENERGIE SOLAIRE, DE DEUX (02) ABREUVOIRS POUR LE GRAND BETAIL, D’UN (01) ABREUVOIR POUR LE PETIT BETAIL ET D’UNE (01) BORNE FONTAINE DANS CERTAINES AIRES DE PATURAGE DE LA COMMUNE DE TOKOMBERE: • • LOT 2 : AIRES DE PATURAGE DE KOTRABA ET DE GAZAYAKA/PALBARA
Prestataire: ETS ABDOULAYE ALI MULTIPLE
Jun 05, 2017 C_TOKOMBERE RECEPTIONNE 50.0 million FCFA 001/M/C.TOK/CIPM-BEC/2017
Construction du CMPJ TOKOMBERE
Prestataire: ETS ABDOULAYE ALI MULTIPLE
Aug 24, 2017 C_TOKOMBERE RECEPTIONNE 20.0 million FCFA 063/LC/MINMAP/DREN/CRPM-AI/SMAS/BSMA/17
Construction d`un forage à énergie solaire dans le centre de collecte de lait deMaklingaï
Prestataire: ETS ABDOULAYE ALI MULTIPLE
Jun 05, 2017 C_TOKOMBERE SIGNE 50.0 million FCFA 001/M/C.TOK/CIPM-BEC/2017
Construction du CMPJ TOKOMBERE
Prestataire: ETS ABDOULAYE ALI MULTIPLE
Jun 05, 2017 C_TOKOMBERE SIGNE 20.0 million FCFA 007/LC/C.TOK/CIPM-ROUTE/2017
Assainissement du Marché de Tokombéré (RP)
Prestataire: ETS ABDOULAYE ALI MULTIPLE
Apr 13, 2017 C_TOKOMBERE RECEPTIONNE 19.0 million FCFA 003/LC/PU/C.TOK/CIPM-TBEC/2017
EP MBELE : Construction d`un bloc de deux (02) salles de classe COMMUNE DE TOKOMBERE Lot 1
Prestataire: ETS ABDOULAYE ALI MULTIPLE
Apr 10, 2017 C_TOKOMBERE RECEPTIONNE 8.0 million FCFA 018/LC/MINMAP/DREN/CRPM-AI/SMAS/BSMA/17
SERAWA CENTRE: Construction d`un forage à PMH
Prestataire: ETS ABDOULAYE ALI MULTIPLE
Apr 10, 2017 C_TOKOMBERE RECEPTIONNE 8.0 million FCFA 0018/LC/MINMAP/DREN/CRPM-AI/SMAS/BSMA/17
SERAWA DOMAYO : Construction d`un forage équipé de PMH
Prestataire: ETS ABDOULAYE ALI MULTIPLE
Apr 10, 2017 C_TOKOMBERE RECEPTIONNE 8.0 million FCFA 00018/LC/MINMAP/DREN/CRPM-AI/SMAS/BSMA/17
MOUNDOUF: Construction d`un forage équipé de PMH
Prestataire: ETS ABDOULAYE ALI MULTIPLE

Top Authorities
Top Prestataires