Total
45
entries found
, Cost: 459.7 million FCFA
Installation of 53 solar street ligthing
Construction of a community pre-school center
Rehabilitation of Bachuo-Akagbe potable water scheme
Acquisition of a Dump truck (20Ton 4X4)
Rehabilitation of rural road bachuo ntai-obang
Opening ot Two Quarry sites in Tinto and Fotabe
Rural electrification in tinto town (phase i)
Construction of a block of two classrooms at GPS Amebisu
Supply of two oil palm processing machines
Rehabilitation of Two Blocks of Classrooms at GS Tinto
Construction of a bloc of market stores at Bachuo-Akagbe Phase
Oct 27, 2022
C_TINTO
SIGNE
16.3 million
FCFA
005/JO/MAYOR/TC/ITB/CIB 2022
Rehabilitation of 2.044km tinto-ntembang-eyang atemako 18km+2.o44km
CONSTRUCTION AND ESTABLISHMENT OF A POULTRY FARM IN TINTO TOWN (TINTO COUNCIL AREA)
RERHABILITATION OF A WAREHOUSE IN TINTO TOWN
CONSTRUCTION OF A BLOCK OF TWO (02) CLASSROOMS AT GS EYANG ATEM AKO (TINTO MUNICIPALITY)
CONSTRUCTION OF A BLOCK OF MARKET STORES AT BACHOU-AKAGBE
CONSTRUCTION OF A MORTUARY AT CMA TINTO (TINTO COUNCIL AREA)
SUPPERVISION OF THE MAINTENANCE WORKS ON THE TINTO NTENEMBANG AND EYANG-ATEM-AKO ROADS SECTION MEASURING 18KM
MAINTENANCE WORKS ON THE TINTO NTENEMBANG AND EYANG-ATEM-AKO SECTIONS MEASURING 18KM
Jun 19, 2020
C_TINTO
SIGNE
6.0 million
FCFA
004/JO/MAYOR/TC/TCITB/PIB/2020
ACQUISITION OF SPECIFIC EQUIPMENT FOR HANDICRAFT PRODUCERS IN TINTO MUNICIPALITY
Jun 19, 2020
C_TINTO
SIGNE
90.0 million
FCFA
001/C/MAYOR/TCITB/PIB/2020
CONSTRUCTION OF ELEVEN (11) EQUPIPED BOREHOLES WITH MANUAL PUMPS IN TINTO MUNICIPALITY
Jun 19, 2020
C_TINTO
SIGNE
8.0 million
FCFA
005/JO/MAYOR/TC/ITB/PIB/2020
SUPPLY OF MEDICAL EQUIPMENT TO IHC MBINJONG - TINTO
Jun 17, 2020
C_TINTO
SIGNE
6.5 million
FCFA
003/JO/MAYOR/TC/TCITB/PIB/2020
CONSTRUCTION OF A VIP LATRINE WITH FOUR (04) COMPARTMENTS AT THE BUSINESS CENTER TINTO
Jun 16, 2020
C_TINTO
SIGNE
5.0 million
FCFA
002/MAYOR/TC/ITB/PIB/2020
CONSTRUCTION OF A LINKAGE BETWEEN TWO BUILDINGS AT CMA TINTO
Jun 16, 2020
C_TINTO
SIGNE
9.7 million
FCFA
001/JO/MAYOR/TC/ITB/PIB/2020
EQUIPMENT IN SLOAR ENERGY AT CMA TINTO
Jun 16, 2020
C_TINTO
SIGNE
17.9 million
FCFA
009/JO/MAYOR/TC/ITB/PIB/2020
CONSTRUCTION OF A BLOCK OF TWO (02) CLASSROOMS AT G.S NFAITOCK 1B IN TINTO
CONSTRUCTION OF A BUSINESS CENTER AT BACHOU - AKAGBE
CONSTRUCTION OF A BUSINESS CENTER AT BAKEBE.
CONSTRUCTION OF A BLOCK OF TWO (02) CLASSROOMS AT G.S EYANG ATEM AKO.
Aug 20, 2019
C_TINTO
SIGNE
58.5 million
FCFA
005/MAYOR/TC/TCTB/PIB/2019
EXTENSION OF A SINGLE PHASE ELECTRICITY NETWORK FROM BAKEBE TO EYANG ATEM AKO
Aug 02, 2019
C_TINTO
RECEPTIONNE
32.0 million
FCFA
002/MAYOR/TC/TCTB/PIB/2019
CONSTRUCTION OF A BUSINESS CENTER AT TINTO WIRE
EQUIPMENT IN SLOAR ENERGY IN SUBDIVISIONAL HOSPITAL TINTO
Nov 19, 2018
C_TINTO
SIGNE
17.0 million
FCFA
004/MAYORTC/TCTB/PIB2018
GS KAPELLE: CONSTRUCTION OF TEACHERS RESIDENCE
Mar 26, 2018
C_TINTO
SIGNE
16.7 million
FCFA
001/MAYOR /TC/TCTB/PIB 2018
GS TINTO-MBU: CONSTRUCTION OF TWO (02) CLASSROOMS.
Mar 26, 2018
C_TINTO
SIGNE
17.1 million
FCFA
003/MAYOR/TC/TCTB/PIB 2018
GS GURIFEN : CONSTRUCTION OF A BLOCK OF TWO (02) CLASSROOMS.
Mar 16, 2018
C_TINTO
SIGNE
17.9 million
FCFA
002/MAYOR/TC/TCTB/PIB 2018
GS DEFANG: CONSTRUCTION OF A BLOCK OF TWO (02) CLASSROOMS.
Oct 10, 2017
C_TINTO
SIGNE
17.9 million
FCFA
003/MAYOR/TC/TCTB/2017
Construction of a Block of Two (02) Classrooms at GS Mambo.
Aug 10, 2017
C_TINTO
SIGNE
14.9 million
FCFA
005/MAYOR/TC/TCTB/2017
EQUIPMENT IN SOLAR ENERGY IN IHC EKPOR - MANYU
Jun 21, 2017
C_TINTO
SIGNE
8.5 million
FCFA
009/MAYOR/TC/TCTB/2017
Construction of a Borehole with Pump at IHC EPKOR - TINTO
Jun 20, 2017
C_TINTO
SIGNE
5.9 million
FCFA
007/JO/MAYOR/TC/TCTB/2017
Supply of Medical Equipments to Ayukaba Betieku IHC - Manyu.
Jun 12, 2017
C_TINTO
SIGNE
32.5 million
FCFA
008/JO/MAYOR/TC/TCTB/2017
CONSTRUCTION OF THE RESIDENCE FOR THE MEDICAL OFFICER IN IHC EKPOR - TINTO
Jun 03, 2017
C_TINTO
SIGNE
7.9 million
FCFA
008/MAYOR/TC/TCTB/2017
SUPPLY OF MEDICAL EQUIPMENTS TO EKPOR IHC - MANYU
May 29, 2017
C_TINTO
SIGNE
17.6 million
FCFA
002/MAYOR/TC/TCTB/2017
Construction of a Block of Two (02) Classrooms at GNS Fotabe.
May 29, 2017
C_TINTO
SIGNE
17.6 million
FCFA
001/JO/MAYOR/TC/TCTB/2017
Construction of a Block of Two (02) Classrooms at G.S. Fotabe
Apr 07, 2017
C_TINTO
RECEPTIONNE
18.3 million
FCFA
004/MAYOR/TC/TCTB/2017
Construction of a Pastoral Borehole with Solar Panels at Bachuo Akagbe.