Total
64
entries found
, Cost: 981.4 million FCFA
Construction of a block of two (02) classrooms at GS Ombe Native
Construction of a community hall in Mutengene
Drill of borehole with electric pump and construction of a water tower to supply two stand taps in quarter 18 Mutengene
Missellele water supply phase II
Extension of electricity to Mutengene Layout
Rehabilitation of shops at the Tiko motor park
Rehabilitation of the road stretch from the paved road at Tchombe`s quarter through catholic church likomba market and back to catholic church likomba street
Acquisition of a fish feed production machine
Extension of electricity from Mutengene old road junction to Plakeinen Street
Construction of a block of two (02) classrooms at GS Holforth layout
Works for tarring and construction of drainage of the stretch of road from Mutengene old road junction to plakeinin, phase III Tiko council
Construction of stretch of road from catholic school Buea road junction to entrance of bingo hospital Limbe road
Drill of borehole with electric pump and construction of a water tower to supply two stand taps in Moquo village
Construction of a hall for the machine and drill of a borehole to supply the fish ponds in Tiko
Jul 18, 2023
C_TIKO
SIGNE
23.6 million
FCFA
012.C/MAYOR TIKO/TCTB/2023
Rehabilitation of shops at the Tiko motor park
Jul 14, 2023
C_TIKO
SIGNE
15.0 million
FCFA
008.C/MAYOR TIKO/TCTB/2023
Drill of borehole with electric pump and construction of a water tower to supply two stand taps in quarter 18 Mutengene
Jun 30, 2023
C_TIKO
SIGNE
14.6 million
FCFA
015.C/MAYOR TIKO/TCTB/2023
Missellele water supply phase II
Jun 29, 2023
C_TIKO
SIGNE
10.0 million
FCFA
004.C/MAYOR TIKO/TCTB/2023
Acquisition of a fish feed production machine
Jun 18, 2023
C_TIKO
SIGNE
25.0 million
FCFA
011.C/MAYOR TIKO/TCTB/2023
Construction of a community hall in Mutengene
Jun 14, 2023
C_TIKO
SIGNE
25.0 million
FCFA
005.C/MAYOR TIKO/TCTB/2023
Extension of electricity from Mutengene old road junction to Plakeinen Street
Jun 13, 2023
C_TIKO
SIGNE
18.0 million
FCFA
003.C/MAYOR TIKO/TCTB/2023
Rehabilitation of a nursery block at GNS Tiko road Mutengene
May 25, 2023
C_TIKO
SIGNE
25.0 million
FCFA
007.C/MAYOR TIKO/TCTB/2023
Construction of a hall for the machine and drill of a borehole to supply the fish ponds in Tiko
May 25, 2023
C_TIKO
SIGNE
18.0 million
FCFA
002.C/MAYOR TIKO/TCTB/2023
Construction of a block of two (02) classrooms at GS Ombe Native
May 25, 2023
C_TIKO
SIGNE
18.0 million
FCFA
001.C/MAOYR TIKO/TCTB/2023
Construction of a block of two (02) classrooms at GS Holforth layout
May 12, 2023
C_TIKO
SIGNE
15.0 million
FCFA
009.C/MAYOR TIKO/TCTB/20203
Drill of borehole with electric pump and construction of a water tower to supply two stand taps in Moquo village
May 12, 2023
C_TIKO
SIGNE
68.0 million
FCFA
014.C/MAYOR TIKO/TCTB/2023
Construction of stretch of road from catholic school Buea road junction to entrance of bingo hospital Limbe road
SUPPLY OF TRANSPORT EQUIPMENT (TRACTOR AND 3 TRAILERS) FOR TIKO COUNCIL
Sep 02, 2022
C_TIKO
SIGNE
100.0 million
FCFA
007/.C/MAYOR TIKO/TCTB/2022
CONSTRUCTION OF LIKOMBA BRIDGE OVER RIVER NDONDO
Aug 18, 2022
C_TIKO
SIGNE
31.9 million
FCFA
005.C/MAYOR TIKO/TCTB/2022
Construction of fingerlings production unit and construction of 06 fish ponds for fattening in tiko.
Aug 16, 2022
C_TIKO
SIGNE
27.0 million
FCFA
002/C/MAYOR TIKO/TCTB/2022
Rehabilitation of the road stretch from tomatoes market through quarter rubber to osbicol college
Aug 08, 2022
C_TIKO
SIGNE
99.8 million
FCFA
003/c/mayor tiko/tctb/2022
Tarring and construction of drainage of the stretch of road from mutengene old road junction to plakeinin phase ii tiko council, fako division, south west Region
Aug 03, 2022
C_TIKO
SIGNE
16.8 million
FCFA
004/.C/MAYOR TIKO/TCTB/2022
Construction of head teachers residence at gs mondoni
Jul 27, 2022
C_TIKO
SIGNE
20.0 million
FCFA
008/N/TCTB/TIKO/2022
SUPPLY GENERATOR FOR THE MUNICIPALITY RESTAURANT
Jul 21, 2022
C_TIKO
SIGNE
60.0 million
FCFA
001/C/MAYOR TIKO/TCTB/2022
Construction of a multipurpose youth empowerment centre in Tiko
Jun 10, 2022
C_TIKO
SIGNE
60.0 million
FCFA
006/.C/MAYOR TIKO/TCTB/2022
Acquisition of official car for the Lord Mayor
Rehabilitation of health Center
Lot 1 : Rehabilitation of the frontal health post at the Tiko WHARF
Jul 03, 2021
C_TIKO
SIGNE
12.0 million
FCFA
001/C/MAYOR/TIKO/TCTB/21
Equipping of the mother and child unit at the medicalised health centre Mutengene
Jun 10, 2021
C_TIKO
SIGNE
100.0 million
FCFA
005/MAYOR/TIKO/TCTB/21
Construction and equipment of a modern ceremonial grandstand in tiko
Jun 01, 2021
C_TIKO
SIGNE
29.9 million
FCFA
006/C/MAYOR TIKO/TCTB/21
Construction of stalls and cold room for the fish market in tiko
Jun 01, 2021
C_TIKO
SIGNE
17.0 million
FCFA
003/C/MAYOR/TIKO/TCTB/2021
Construction of a block of two classrooms at GS Boma Street
GS Holgorth: Construction of a block of 2 classrooms
Tiko: Pavement of street 2 to street 7 entrance
Ebunji village: Extension of the electricity network and installation of a monophase transformer
TIKO COUNCIL : Construction of an agricultural station in Missellele- Tiko
Mungo native IHC: construction of an intergrated health center
TIKO : Construction of a fishing center
TIKO : Construction of a vaccination park
Mungo native IHC: Supply of medical equipments
TIKO COUNCIL : Construction of an agricultural station in Ebunji
Provision of portable water to Missellele
BWINGA-TIKO : Construction of a Borehole equipped with a manual pump
CMA HOLFORTH : Construction of a Mother and Child Pavilion : LOT 2
CMA HOLFORTH : Equipment of mother and child lodge built
GS MPONGO MATUTE: Construction of a block of two (02) classrooms
Pavement of street two entrance to police junction
MISSELLELE : Construction of community homes
TIKO: CONSTRUCTION OF A MUNICIPAL GUEST HOUSE LIMBE
SUPPLY OF MEDICAL EQUIPMENTS TO IHC LIKOMBA
IHC LIKOMBA : Construction of the care building : LOT 1
Jun 10, 2018
C_TIKO
SIGNE
25.0 million
FCFA
N/003/JO/MAYORTIKO/TCTB/2018
Ombé: Construction of pig multiplication station, lot 2
Jun 01, 2018
C_TIKO
SIGNE
59.8 million
FCFA
N/004/JO/MAYORTIKO/TCTB/2018
MUTENGUENE: Construction of a slaughter house equipped with overhead
Jun 01, 2018
C_TIKO
SIGNE
17.0 million
FCFA
N/01/JO/MAYOR/TIKO/TCTB/2018
EP UPPER COSTAINS : Construction of 02 classrooms
Jun 01, 2018
C_TIKO
SIGNE
30.0 million
FCFA
N/002/JO/MAYORTIKO/TCTB/2018
TIKO: Construction of a Zootechnical and Veterany Center, lot 1
Equipment of IHC Moquo, lot 2