sort by date sort by cost
Total 7 entries found , Cost: 79.0 million FCFA
2023 C_TIKO ATTRIBUE
Construction of a hall for the machine and drill of a borehole to supply the fish ponds in Tiko
2023 C_TIKO ATTRIBUE
Construction of a block of two (02) classrooms at GS Ombe Native
2023 C_TIKO ATTRIBUE
Construction of a block of two (02) classrooms at GS Holforth layout
Jun 13, 2023 C_TIKO SIGNE 18.0 million FCFA 003.C/MAYOR TIKO/TCTB/2023
Rehabilitation of a nursery block at GNS Tiko road Mutengene
May 25, 2023 C_TIKO SIGNE 18.0 million FCFA 002.C/MAYOR TIKO/TCTB/2023
Construction of a block of two (02) classrooms at GS Ombe Native
May 25, 2023 C_TIKO SIGNE 18.0 million FCFA 001.C/MAOYR TIKO/TCTB/2023
Construction of a block of two (02) classrooms at GS Holforth layout
May 25, 2023 C_TIKO SIGNE 25.0 million FCFA 007.C/MAYOR TIKO/TCTB/2023
Construction of a hall for the machine and drill of a borehole to supply the fish ponds in Tiko

Top Authorities
Top Dates