sort by date sort by cost
Total 12 entries found , Cost: 392.6 million FCFA
Jun 13, 2024 C_TIGNERE SIGNE 30.0 million FCFA 10/LC/R-AD/D-FD/C.TIG/SG/SIGAM/2024
Construction d`un bloc maternel à l`EMA Pastoral
Prestataire: ETS COCOM MULTIPLE
Jun 13, 2024 C_TIGNERE SIGNE 21.0 million FCFA 09/LC/R-AD/D-FD/C.TIG/SG/SIGAM/2024
Construction d`un bloc de deux (2) salles de classe l`EP Nyaroum Kaou Iya (lot 2)
Prestataire: ETS COCOM MULTIPLE
Jun 13, 2024 C_TIGNERE SIGNE 17.0 million FCFA 08/LC/R-AD/D-FD/C.TIG/SG/SIGAM/2024
Construction d`un logement (boukarou au site touristique de Damougaré)
Prestataire: ETS COCOM MULTIPLE
May 21, 2024 C_TIGNERE SIGNE 15.0 million FCFA 03/LC/R-AD/D-FD/C.TIG/SG/SIGAM/2024
Construction d`une cuisine servant à l`apprentissage volet restauration au CPFF de Tignère
Prestataire: ETS BINKOLA MULTIPLE
May 21, 2024 C_TIGNERE SIGNE 10.6 million FCFA 02/LC/R-AD/D-FD/C.TIG/SG/SIGAM/2024
Réhabilitation d`un bloc de deux (2) salles de classe à l`EP Libong marché
Prestataire: MOHAMADOU LABARANG MULTIPLE
May 21, 2024 C_TIGNERE SIGNE 30.0 million FCFA 04/LC/R-AD/D-FD/C.TIG/SG/SIGAM/2024
Construction d`un atelier de mécanique SAR/SM de Tignère
Prestataire: ETS BINKOLA MULTIPLE
May 21, 2024 C_TIGNERE SIGNE 21.0 million FCFA 06/LC/R-AD/D-FD/C.TIG/SG/SIGAM/2024
Construction d`un bloc de deux (2) salles de classe à l`EP Bourlé (lot 1)
Prestataire: ETS RKT MISSING
May 21, 2024 C_TIGNERE SIGNE 23.0 million FCFA 05/LC/R-AD/D-FD/C.TIG/SG/SIGAM/2024
Ouverture de la piste agricole Sadek-Mayo Rokongo 1 et 2
Prestataire: ETS BINKOLA MULTIPLE
May 21, 2024 C_TIGNERE SIGNE 10.0 million FCFA 01/LC/R-AD/D-FD/C.TIG/SG/SIGAM/2024
Réhabilitation du bâtiment du CMPJ de Tignère
Prestataire: ETS SUPER MARCHE MULTIPLE
Mar 28, 2024 C_TIGNERE SIGNE 50.0 million FCFA 03/M/R-AD/D-FD/C.TIG/SG/SIGAM/2024
Entretien de la voirie axe ENEO Mayo Djarandi
Prestataire: ETS JUSTE PRIX MULTIPLE
Mar 27, 2024 C_TIGNERE RECEPTIONNE 100.0 million FCFA 01/M/R-AD/D-FD/C.TIG/SG/SIGAM/2024
Acquisition d`un camion-benne
Prestataire: ETS ZAKAR ET FRERES MULTIPLE
Mar 27, 2024 C_TIGNERE SIGNE 65.0 million FCFA 02/M/R-AD/D-FD/C.TIG/SG/SIGAM/2024
Ouverture de la route troncon Sadek-Garbaya Yelwa (13,65 km)
Prestataire: ETS ZAKAR ET FRERES MULTIPLE

Top Authorities
Top Dates