sort by date sort by cost
Total 2 entries found , Cost: 127.0 million FCFA
Jun 20, 2022 C_TIGNERE RECEPTIONNE 100.0 million FCFA 03/M/R-AD/D-FD/CTG/CIPM.CTIG/ST/2022
Construction d`un ouvrage d`art sur le Mayo Gassanguel au pk5+00 de l`axe Gassanguel-Labbaré
Prestataire: ETS ZAKAR ET FRERES MULTIPLE
Jun 20, 2022 C_TIGNERE RECEPTIONNE 27.0 million FCFA 07/LC/R-AD/D-FD/CTG/CIPM.CTIG/ST/2022
Ouverture/entretien de 3 routes: route communale lot 1 Gassanguel (inter R0801)-Labbaré Modibbo sur 9,1927 km; lot 2: Gassanguel-Nyaroum Akaou Iya sur 7 km; lot3: Carrefour Galim-Mayo Beli (C0818041 sur 3 km )
Prestataire: ETS ZAKAR ET FRERES MULTIPLE

Top Authorities
Top Prestataires
Top Dates