sort by date sort by cost
Total 4 entries found , Cost: 90.0 million FCFA
Jul 31, 2023 C_TIGNERE SIGNE 27.0 million FCFA 19/LC/R-AD/D-FD/C-TIG/SG/SIGAM/2023
Ouverture de 2 routes communales : Inter RN14-Damougaré (4 km) et Inter RN14-Mbakana (10,5 km)
Prestataire: ETS IMANE MULTIPLE
Jul 31, 2023 C_TIGNERE SIGNE 24.0 million FCFA 17/LC/R-AD/D-FD/C-TIG/SG/SIGAM/2023
Ouverture d`une piste agricole Bourlé-Mayo Béli (7 km)
Prestataire: ETS IMANE MULTIPLE
May 13, 2020 C_TIGNERE RECEPTIONNE 18.0 million FCFA 01/LC/R-AD/D-FD/C.TG/CIPM-CTIG/ST/2020
Ecole Primaire de Yelwa : Construction d`un bloc de deux salles de classe
Prestataire: ETS IMANE MULTIPLE
Apr 23, 2018 C_TIGNERE RECEPTIONNE 21.0 million FCFA 003/LC/DRMAP-AD/DDMAP-FD/CDPM-FD/2018
Travaux de construction d`un bloc de deux salles de classe à l`EP MAGNANG
Prestataire: ETS IMANE MULTIPLE

Top Authorities
Top Prestataires