Total 3 entries found , Cost: 46.0 million FCFA
Jul 25, 2018 C_TIBATI SIGNE 15.0 million FCFA 011/LC/MO/CIPM/C-TIB/2018
Construction d`un ponceau à MAYO MBANA-DOBER (2e phase)
Prestataire: ETS AMINCHI MISSING
Apr 17, 2018 C_TIBATI RECEPTIONNE 21.0 million FCFA 003/LC/MO/CIPM/C-TIB/2018
Construction d`un bloc de 02 salles de classe à l`EP de DJAOURO GARGA
Prestataire: ETS AMINCHI MISSING
May 23, 2017 C_TIBATI RECEPTIONNE 10.0 million FCFA 012/LC/C-TIB/CIPM/2017
Construction d`un ponceau sur la rivière Mayo-Mbana à Daber, lot 1
Prestataire: ETS AMINCHI MISSING