sort by date sort by cost
Total 2 entries found , Cost: 40.0 million FCFA
May 23, 2017 C_TIBATI SIGNE 10.0 million FCFA 012/LC/C-TIB/CIPM/2017
Construction d`un ponceau sur la rivière Mayo-Mbana à Daber, lot 1
Prestataire: ETS AMINCHI MISSING
Apr 05, 2017 C_TIBATI SIGNE 30.0 million FCFA 008/LC/MO/CIPM/C-TIB/2017/2017
Construction du poste de contrôle des pêches de Tibati, lot 1
Prestataire: ETS AMINCHI MISSING

Top Authorities
Top Prestataires
Top Dates