sort by date sort by cost
Total 4 entries found , Cost: 63.9 million FCFA
Aug 27, 2022 C_TCHATIBALI SIGNE 18.7 million FCFA 004/2022/LC/C.TLI/SG/CIPM
Construction d`un bloc de deux salles de classe à EP Gouna Lot 1
Aug 27, 2022 C_TCHATIBALI SIGNE 7.5 million FCFA 007/LC/C.TLI/CIPM-AI/2022
Construction d`un forage équipé de PMH à Tiliga Lot 1
Jun 24, 2021 C_TCHATIBALI SIGNE 19.0 million FCFA 0003/2021/LC/C.TLI/SG/CIPM
Construction d`un bloc de 2 salles de classe à l`EPB DE TCHATIBALI Lot 2
Jun 24, 2021 C_TCHATIBALI SIGNE 18.8 million FCFA 002/2021/LC/C.TLI/SG/CIPM
Construction d`un bloc de 2 salles de classe à l`EP de GANE Lot 4

Top Authorities
Top Dates