sort by date sort by cost
Total 3 entries found , Cost: 48.5 million FCFA
Jun 06, 2022 C_PITOA RECEPTIONNE 16.6 million FCFA 03/LC/C-PTA/CIPM/2022
Construction de 01 bloc de 02 salles de classe à l`EP DE MBOURA (lot 3).
Jun 06, 2022 C_PITOA RECEPTIONNE 16.7 million FCFA 04/LC/C-PTA/CIPM/2022
Construction de 01 bloc de 02 salles de classe à l`EP DE POUTCHI (lot 4).
Jun 06, 2022 C_PITOA RECEPTIONNE 15.2 million FCFA 06/LC/C-PTA/CIPM/2022
Construction d`un logement d`astreinte à l`EP DOULOUMI

Top Authorities
Top Dates