sort by date sort by cost
Total 2 entries found , Cost: 35.8 million FCFA
Jun 06, 2022 C_PITOA RECEPTIONNE 17.9 million FCFA 01/LC/C-PTA/CIPM/2022
Construction de 01 bloc de 02 salles de classe à l`EP DE BE (lot 1).
Jun 06, 2022 C_PITOA RECEPTIONNE 17.9 million FCFA 02/LC/C-PTA/CIPM/2022
Construction de 01 bloc de 02 salles de classe à l`EP DE MBARA (lot 2).

Top Authorities
Top Prestataires
Top Dates