EXECUTION DES TRAVAUX DE BITUMAGE ECONOMIQUE EN ENDUIT BICOUCHE DU TRONCON DE ROUTE CARREFOUR SIM DZEDZE-CARREFOUR SIMKE LONG DE 1500ML DANS LA COMMUNE DE PETE BANDJOUN.
Dec 24, 2020
C_PETE_BANDJOUN
SIGNE
41.1 million
FCFA
14/LC/CPB/SG/CIPM-RIR/2020
CONSTRUCTION D`UN DALOT DOUBLE DE 2.5*3*2 AU PK7+200 DU TRONCON DE ROUTE COMMUNALE TESSE-BUGAM-DJIONE A POUMOUGNE.
Sep 15, 2020
C_PETE_BANDJOUN
SIGNE
197.7 million
FCFA
003/M/CPB/SG/CIPM-RIR/2020
EXECUTION DES TRAVAUX DE BITUMAGE ECONOMIQUE EN ENDUIT BICOUCHE DU TRONCON DE ROUTE CARREFOUR SIM DZEDZE-CARREFOUR SIMKE LONG DE 1500ML DANS LA COMMUNE DE PETE BANDJOUN.
Jun 17, 2020
C_PETE_BANDJOUN
SIGNE
14.3 million
FCFA
009/LC/CPB/SG/CIPM-AG/2020
FOURNITURES DES PAQUETS MINIMA DANS LES ECOLES PUBLIQUES DE LA COMMUNE DE PETE-BANDJOUN.