Total
24
entries found
, Cost: 410.4 million FCFA
CONSTRUCTION D`UN FORAGE SOLAIRE POUR L`APPROVISIONNEMENT EN EAU POTABLE AVEC RESERVOIR EN BETON ARME D`UNE CAPACITE DE 20M3 AU COMPLEXE MARCHAND DE LEBOUDI
CONSTRUCTION D`UN BLOC DE DEUX SALLES DE CLASSE ET D`UN BLOC TOILETTES A 6 COMPARTIMENTS A L`EP DE NKODASSA
CONSTRUCTION D`UN BLOC DE DEUX SALLES DE CLASSE AVEC UN BLOC TOILETTES A 6 COMPARTIMENTS A L`EP DE NKODASSA
CONSTRUCTION D`UN BLOC DE DEUX SALLES DE CLASSE ET D`UN BLOC TOILETTES A 6 COMPARTIMENTS A L`EP DE NKOLDOM
CONSTRUCTION D`UN COMPLEXE MARCHAND A LEBOUDI
CONSTRUCTION D`UN FORAGE SOLAIRE AVEC RESERVOIR EN BETON ARME AU CSI DE MVOUA
ACQUISITION DES FOURNITURES PEDAGOGIQUES ET SCOLAIRES POUR LE COMPTE DES ECOLES PRIMAIRES DE LA COMMUNE D`OKOLA
CONSTRUCTION D`UN CSI AVEC LOGEMENT D`ASTREINTE A MVOUA
CONSTRUCTION D`UN BLOC DE DEUX SALLES DE CLASSE ET D`UN BLOC TOILETTES A 6 COMPARTIMENTS A L`EP DE MEKAK
Oct 17, 2022
C_OKOLA
SIGNE
85.9 million
FCFA
05/M/CO/CIPM/22
Transformation de l`ancien Mairie d`Okola en auberge Municipal
Oct 13, 2022
C_OKOLA
SIGNE
9.5 million
FCFA
09/LC/CO/CIPM/22
Travaux de réhabilitation de la SAR/SM d`Okola
Sep 20, 2022
C_OKOLA
SIGNE
57.4 million
FCFA
06/M/CO/CIPM/22
CONSTRUCTION D`UN PONT DEFINITIF SUR LA RIVIERE NGOBO DU TRONCON MVAA AYOS NKOLPOBLO
Aug 18, 2022
C_OKOLA
SIGNE
20.0 million
FCFA
08/LC/CO/CIPM/22
Construction de huit (08) boutiques au centre commercial d`Okola
Aug 18, 2022
C_OKOLA
SIGNE
30.0 million
FCFA
07/LC/CO/CIPM/22
Equipement du centre de promotion de la femme et de la famille (CPFF) d`Okola
Jul 28, 2022
C_OKOLA
SIGNE
25.0 million
FCFA
06/LC/CO/CIPM/22
extension de l`adduction d`eau d`Ebanga
Jul 25, 2022
C_OKOLA
SIGNE
17.8 million
FCFA
05/LC/CO/CIPM/22
Construction d`un bloc de deux (02) salles de classe à l`EP Kouba
May 04, 2022
C_OKOLA
SIGNE
18.9 million
FCFA
01/M/CO/JO3/CIPM/22
CONSTRUCTION D`UN FORAGE A ÉNERGIE SOLAIRE A L`EP DE METAK
May 04, 2022
C_OKOLA
SIGNE
25.4 million
FCFA
02/M/CO/CIPM/21
CONSTRUCTION D`UN BLOC DE DEUX SALLES DE CLASSE ET D`UN BLOC TOILETTES A 6 COMPARTIMENTS A L`EP DE METAK
May 04, 2022
C_OKOLA
SIGNE
19.4 million
FCFA
02/LC/CO/CIPM/21
CONSTRUCTION D`UN FORAGE A ENERGIE SOLAIRE A L`EP DE MEKAK
May 04, 2022
C_OKOLA
SIGNE
25.4 million
FCFA
02/M/CO/CIPM/22
CONSTRUCTION D`UN BLOC DE DEUX SALLES DE CLASSE ET D`UN BLOC TOILETTES A 6 COMPARTIMENTS A L`EP DE ZAMENGOE
May 04, 2022
C_OKOLA
SIGNE
19.0 million
FCFA
1/LC/CO/CIPM/21
CONSTRUCTION D`UN FORAGE A ENERGIE SOLAIRE A L`EP DE LEVOLOMBERE
May 04, 2022
C_OKOLA
SIGNE
18.9 million
FCFA
001/M/CO/CIPM/22
CONSTRUCTION D`UN FORAGE A ENERGIE SOLAIRE A L`EP DE ZAMENGOE
May 04, 2022
C_OKOLA
SIGNE
19.0 million
FCFA
01/LC/CO/CIPM/22
CONSTRUCTION D`UN FORAGE A ENERGIE SOLAIRE A L`EP DE NKODASSA
May 04, 2022
C_OKOLA
SIGNE
18.9 million
FCFA
01/M/C.OKOLA/CIPM/22
CONSTRUCTION D`UN FORAGE A ENERGIE SOLAIRE A L`EP DE NKOLONDOM