sort by date sort by cost
Total 4 entries found , Cost: 81.0 million FCFA
Jun 25, 2021 C_NYANON SIGNE 9.8 million FCFA LC n°010/LC/C.NYANON/MO/CIPM/2021
Travaux d`achèvement de construction du Centre Zootechnique et Vétérinaire (CZV) de NYANON
Prestataire: STE ACHENKA SARL
Jun 25, 2021 C_NYANON SIGNE 18.2 million FCFA LC n°011/LC/C.NYANON/MO/CIPM/2021
Travaux de construction d`un forage pastoral au CZV de NYANON
Prestataire: STE ACHENKA SARL
May 19, 2020 C_NYANON SIGNE 28.1 million FCFA 010/LC/C.NYN/SG/2020
AXE NKONGKWALLA - LOG NDOCK-NDOG BATOGUE 1-NDOG BATOGUE 2-BAYA LOG NTOMB : Electrification rurale
Prestataire: STE ACHENKA SARL
May 19, 2020 C_NYANON SIGNE 24.8 million FCFA 009/LC/C.NYN/SG/2020
Réhabilitation du réseau électrique sur les axes NYAHO-SONGMBOG-NKONGKWALLA et LOBIKOY - PENDIKI LOT 4
Prestataire: STE ACHENKA SARL

Top Authorities
Top Prestataires
Top Dates