sort by date sort by cost
Total 5 entries found , Cost: 40.0 million FCFA
Apr 11, 2018 C_NKONG_ZEM SIGNE 8.0 million FCFA 01/K/MINMAP/DR-OU/SMI/2018
Construction d`un forage équipé de PMH A Bassessa Mbiih 2 Foloh (Mo`oh Koutsing)
Apr 11, 2018 C_NKONG_ZEM SIGNE 8.0 million FCFA 01/D/MINMAP/DR-OU/SMI/2018
CONSTRUCTION D`UN FORAGE ÉQUIPÉ DE PMH AU CSI de NZINMEZO
Apr 10, 2018 C_NKONG_ZEM SIGNE 8.0 million FCFA 01/MI/MINMAP/DR-OU/SMI/2018
CONSTRUCTION D`UN FORAGE ÉQUIPÉ DE PMH A Fombet Ecole Catholique
Apr 10, 2018 C_NKONG_ZEM SIGNE 8.0 million FCFA 01/M/MINMAP/DRMAP/DR-OU/2018
Construction d`un forage équipé de PMH A Nziih Quartier Mezet (Kemguazang)
Apr 10, 2018 C_NKONG_ZEM SIGNE 8.0 million FCFA 01/N/MINMAP/DRMAP/DR-OU/SMI/2018
Construction d`un forage équipé de PMH A Zemtsuet (Entrée Tawa)

Top Authorities
Top Dates