sort by date sort by cost
Total 2 entries found , Cost: 28.0 million FCFA
May 17, 2020 C_NKONG_ZEM RECEPTIONNE 10.0 million FCFA 01/LC/AONO/CIPM/C.NK-ZEM/BEC/2020
Réhabilitation de l’EM de Mbeng (Lot 1)
Prestataire: ETS RETGUEL MISSING
Apr 17, 2020 C_NKONG_ZEM RECEPTIONNE 18.0 million FCFA 10/LC/AONO/CIPM/C.NK-ZEM/BEC/2020
Construction d’un dalot double entre paroisse saint laurent et Kem Nang (Lot 2)
Prestataire: ETS RETGUEL MISSING

Top Authorities
Top Prestataires
Top Dates