sort by date sort by cost
Total 13 entries found , Cost: 588.2 million FCFA
2020 C_NKONGSAMBA_III INFRUCTUEUX
TRAVAUX DE CONSTRUCTION DE 10 (DIX) BOUTIQUES AU MARCHE DE POOLA
Prestataire: MISSING
Dec 22, 2020 C_NKONGSAMBA_III SIGNE 29.5 million FCFA 09/LC/CAN3/SIGAMP/2020
L`acquisition de 10 tricycles et matériel de désherbage pour enlévement des ordures ménagéres
Prestataire: ETS GLOBAL SERVICES MULTIPLE
Oct 09, 2020 C_NKONGSAMBA_III RECEPTIONNE 17.9 million FCFA 03/LC/CAN3E/SG/SIGAMP//2020
EP de Ngwa :Construction d`un bloc de deux salles de classe
Prestataire: ETS GLOBAL SERVICES PLUS MULTIPLE
Sep 30, 2020 C_NKONGSAMBA_III RECEPTIONNE 40.0 million FCFA 01/LC/CAN3/SG/SIGAMP/2020
TRAVAUX DE CONSTRUCTION D`UN HALL AU MARCHE DE POOLA
Prestataire: WOUBENG V.F. ENGINEERING MISSING
Sep 25, 2020 C_NKONGSAMBA_III SIGNE 21.5 million FCFA 08/LC/CAN3/SG/SIGAMP/20
TRAVAUX DE CONSTRUCTION DE 10 (DIX) BOUTIQUES AU MARCHE DE POOLA
Prestataire: ETS LEPPA & FILS MISSING
Aug 03, 2020 C_NKONGSAMBA_III RECEPTIONNE 7.6 million FCFA 06/LC/CAN3/SG/SIGAMP/20
CSI d`Ekol-Mbeng: Equipement en matériel médical
Prestataire: ETS AMAES MULTIPLE
Aug 03, 2020 C_NKONGSAMBA_III RECEPTIONNE 5.0 million FCFA 07/LC/CAN3/SGSIGAMP/20
Ecole Pilote de Mbaressoumtou-Aviation: Equipement dans le cadre de l`éducation inclusive COMMUNE DE NKONGSAMBA IIIe
Prestataire: E.C.P.S MISSING
Aug 03, 2020 C_NKONGSAMBA_III SIGNE 24.8 million FCFA 02/LC/CAN3/SG/SIGAMP/20
TRAVAUX DE CONSTRUCTION D`UN BLOC MATERNEL A L`ECOLE MATERNELLE DE POOLA
Prestataire: ETS ZENAWA & FILS
Jul 21, 2020 C_NKONGSAMBA_III RECEPTIONNE 27.0 million FCFA 05/LC/CAN3/SG/SIGAMP/20
Réhabilitation du tronçon Eyes clinic – carrefour quartier 3 – Hôpital Regional de Nkongsamba
Prestataire: ETS GAGA FILS MISSING
Jul 17, 2020 C_NKONGSAMBA_III SIGNE 99.9 million FCFA 08/M/AN3/SG/SIGAMP/20
POOLA:Construction d`une Adduction en Eau Potable
Prestataire: ZAIN GLOBAL COMPANY LTD 10months
Apr 06, 2020 C_NKONGSAMBA_III SIGNE 278.9 million FCFA 01/M/CAN3/SG/SIGAMP/20
Travaux d’achèvement de construction de l’hôtel de ville
Sep 30, 2019 C_NKONGSAMBA_III RECEPTIONNE 27.7 million FCFA 07/LC/CTD-CAN3/SG/SIGAMP/19
Réhabilitation dutronçon carrefour piste-PMI Nlonako-National n° 5-PMI Nlonako-Centre sacré cœur des sœurs-PMI Nlonako-Collège Mbamy Fochada
Prestataire: ETS KUNDUNA MULTIPLE
Sep 30, 2019 C_NKONGSAMBA_III RECEPTIONNE 8.5 million FCFA 06/LC/CTD-NKONGSAMBA3/SG/SIGAMP/19
EKOL-BENG : Construction d`un espace aéré
Prestataire: ETS TONY X MISSING