sort by date sort by cost
Total 3 entries found , Cost: 25.5 million FCFA
Oct 18, 2019 C_NKONDJOCK SIGNE 8.5 million FCFA 009/LC/C.NKONDJOCK/2019
Réhabilitation de station SCANWATER BENGA
Prestataire: ETS PRINCE'S DREAM 3months
Oct 18, 2019 C_NKONDJOCK SIGNE 8.5 million FCFA 009LC/C.NKONDJOCK/2019
Réhabilitation de station SCANWATER MATOUBE
Prestataire: ETS PRINCE'S DREAM 3months
Oct 18, 2019 C_NKONDJOCK SIGNE 8.5 million FCFA 08/LC/C.NKONDJOCK/2019
Réhabilitation de stations SCANWATER SOHOCK
Prestataire: ETS PRINCE'S DREAM 3months